Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🔌 Bid Invitation: Installation Of Electricity Metering Premises 🏭 Paschimanchal Vidyut Vitran Nigam Ltd., Under The State Government And Union Territories, Is Seeking Bids For The Installation Of Electricity Metering Premises For Consumers Where The Electric Meter Is Located Outside The Premises. This Project Falls Under The Electricity Distribution Division In Modinagar. 📅 Bid Submission Deadline: April 24, 2024, 12:00 Pm Tender Fee: Inr 1180 Emd: Inr 2000 Interested Bidders Should Submit Detailed Proposals, Including Technical Specifications, Methodology, And Cost Estimates, Adhering To The Guidelines Provided In The Tender Document. Keywords: Electricity Distribution Division, Modinagar, Paschimanchal Vidyut Vitran Nigam Ltd, Electricity Metering Premises, Installation Services, Tender, Bid, State Govt. And Ut| Particulars | Details |
|---|---|
| Title |
Work Related To Installing Such Premises Outside The Premises Under Electricity Distribution Division, Modinagar Where The Electric Meter Is Inside The Premises.
|
| Description |
Work Related To Installing Such Premises Outside The Premises Under Electricity Distribution Division, Modinagar Where The Electric Meter Is Inside The Premises.
|
| Organisation | Paschimanchal Vidyut Vitran Nigam Ltd. | State Govt. and UT |
| Tender Id | 2024_PVVNL_922025_1 |
|
Reference Number |
T-02/2024-25/EDC/GZB |
| Tender Fee | 1180 |
| EMD | 2000 |
| Tender Value | - |
| Place | Superintending Engineer EDC GZB |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1592558 |
| Start Date | April 10, 2024 23:30 |
| End Date |
Expired
24/04/2024
Expired 902 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Running and maintenance work of plumbing and water supply in office building guest house security barrack and inside premises and painting of inside outside premises and flowering pot at mcl bhubaneswar for a period of two years
Running and maintenance work of plumbing and water supply in office building guest house security barrack and inside premises and painting of inside outside premises and flowering pot at mcl bhubaneswar for a period of two years
Read moreCleaning and sweeping of konkan bhavan main and annex building internal premises, outside premises and other related works at cbd belapur navi mumbai (01 oct 2026 to 31 mar 2027)
Cleaning and sweeping of konkan bhavan main and annex building internal premises, outside premises and other related works at cbd belapur navi mumbai (01 oct 2026 to 31 mar 2027)
Read moreFacility management services - lumpsum based - as per sow & atc job for assistance/ breakdown maintenance of lifts situated inside and outside the plant premises as per sow & atc consumables to be provided by service provider (inclusive in contract..
Facility management services - lumpsum based - as per sow & atc job for assistance/ breakdown maintenance of lifts situated inside and outside the plant premises as per sow & atc consumables to be provided by service provider (inclusive in contract..
Read moreMeasuring steel tape 5 meter,combination plier insulated 200 mm,screw driver insulated 4mm x 150 mm diamond head,screw driver insulated 6mm x 150 mm diamond head,electrician screw driver thin stem insulated handle 4mm x 100 mm,heavy duty screw driver insulated 5mm x 200 mm,electrician screw driver thin stem insulated handle 4mm x 250 mm,punch centre 10mm x 150 mm,neon tester 500 v,steel rule graduated both in metric and english unit 300 mm,hammer cross peen with handle 250 grams,hammer ball peen with handle 500 grams,c clamp 200 mm,c clamp 100 mm,blow lamp brass,pipe vice cast iron with hardened jaw open type 100 mm,crimping tool 16 sq mm to 95 sq mm,wire cutter and stripper 150 mm,hacksaw frame adjustable 300 mm,try square150 mm blade,outside calliper 150 mm spring type,inside calliper 150 mm spring type,divider 150 mm spring type,pliers long nose insulated 150 mm,de metric spanner double ended set of 12 pieces 6mm to 32mm,drill ss twist block 2 mm 5 mm and 6 mm of 3,gauge wire imperial stainlees steel m
Measuring steel tape 5 meter,combination plier insulated 200 mm,screw driver insulated 4mm x 150 mm diamond head,screw driver insulated 6mm x 150 mm diamond head,electrician screw driver thin stem insulated handle 4mm x 100 mm,heavy duty screw driver insulated 5mm x 200 mm,electrician screw driver thin stem insulated handle 4mm x 250 mm,punch centre 10mm x 150 mm,neon tester 500 v,steel rule graduated both in metric and english unit 300 mm,hammer cross peen with handle 250 grams,hammer ball peen with handle 500 grams,c clamp 200 mm,c clamp 100 mm,blow lamp brass,pipe vice cast iron with hardened jaw open type 100 mm,crimping tool 16 sq mm to 95 sq mm,wire cutter and stripper 150 mm,hacksaw frame adjustable 300 mm,try square150 mm blade,outside calliper 150 mm spring type,inside calliper 150 mm spring type,divider 150 mm spring type,pliers long nose insulated 150 mm,de metric spanner double ended set of 12 pieces 6mm to 32mm,drill ss twist block 2 mm 5 mm and 6 mm of 3,gauge wire imperial stainlees steel m
Read morePincer 150 mm,spanner adjustable forged ss 150 mm,spanner adjustable forged ss 300mm,chisel cold 25 mm x 200 mm,chisel firmer with wooden handle 6 mm x 200 mm,allen key alloy steel of 9,grease gun 0 5 ltr capacity,bradawl,pully puller with 3 legs 150 mm,pully puller with 3 legs 300mm,bearing puller inside 200 mm,bearing puller outside 200 mm,scissors blade ss 200mm,scissors blade ss 150 mm,crimping tool 1 point 5 sq mm to 16 sq mm,mallet hard wood 0 point 50 kg,hammer extractor type 250 grams,hacksaw frame fixed 150 mm,pliers flat nose insulated 200 mm,pliers round nose insulated 100 mm,tweezers 150 mm,file flat bastard 250 mm with handle,file rasp half round 200 mm bastard with handle,de soldering gun heat proof nozzle pvc type 250mm,hand vice 50 mm jaw,contactor auxiliary contacts 3 phase,rotary switch 16 a 440v,hydrometer,thermometer digital 0 degree c to 150 degree c,earth electrode primary electrode,safety belt standard quality,ac energy meter three phase 15 a 440 v induction type,electric
Pincer 150 mm,spanner adjustable forged ss 150 mm,spanner adjustable forged ss 300mm,chisel cold 25 mm x 200 mm,chisel firmer with wooden handle 6 mm x 200 mm,allen key alloy steel of 9,grease gun 0 5 ltr capacity,bradawl,pully puller with 3 legs 150 mm,pully puller with 3 legs 300mm,bearing puller inside 200 mm,bearing puller outside 200 mm,scissors blade ss 200mm,scissors blade ss 150 mm,crimping tool 1 point 5 sq mm to 16 sq mm,mallet hard wood 0 point 50 kg,hammer extractor type 250 grams,hacksaw frame fixed 150 mm,pliers flat nose insulated 200 mm,pliers round nose insulated 100 mm,tweezers 150 mm,file flat bastard 250 mm with handle,file rasp half round 200 mm bastard with handle,de soldering gun heat proof nozzle pvc type 250mm,hand vice 50 mm jaw,contactor auxiliary contacts 3 phase,rotary switch 16 a 440v,hydrometer,thermometer digital 0 degree c to 150 degree c,earth electrode primary electrode,safety belt standard quality,ac energy meter three phase 15 a 440 v induction type,electric
Read moreOutside caliper,inside caliper,divider,feeler gauge,outside micro -meter,inch,universal bevel protr
Read more
Work for installation of sing phase meter from inside to outside
Work for installation of sing phase meter from inside to outside under edd-iii, jnp
Read moreAnnual maintenance for landscaped area inside and outside the port premises
Please refer tender document
Read moreThe work of replacement of single phase idf meter with new departmental meter and installing it outside the premises of the consumer under eudd-ii, muzaffarnagar.
The work of replacement of single phase idf meter with new departmental meter and installing it outside the premises of the consumer under eudd-ii, muzaffarnagar.
Read moreThe work of replacement of single phase idf meter with new departmental meter and installing it outside the premises of the consumer under eudd-ii, muzaffarnagar.
The work of replacement of single phase idf meter with new departmental meter and installing it outside the premises of the consumer under eudd-ii, muzaffarnagar.
Read moreof your Industry type