Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Outsourcing Of Labour Part For Erection, Testing And Commissioning Of New 11 Kvlt/Ht Lines On Rail/Pcc Poles, Distribution T/Fs, Augmentation/Sagging Of Acsr Of Ht/Lt Lines, Cables Laying, Guarding, Stay Setfor Various Works Under Ds Division Rampura.
|
Description |
Such As Releasing Of T/Well Connections, Gsc/Isc Connections, Deloading Of Overloaded T/Fs, Shifting Of Meters Outside Consumer Premises, Earthing Of D Ts/Lines Or Any Development Works Under Ds Division Rampura.
|
Organisation | Department of Power | State Govt. and UT |
Tender Id | 2024_POWER_128711_1 |
Reference Number |
07/SE/DS/BTI/2024-25 |
Tender Fee | 4720 |
EMD | 60000 |
Tender Value | |
Place | RAMPURA PHUL |
Link | https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=261064 |
Start Date | October 15, 2024 16:30 |
End Date |
30/10/2024 ( Expired 248 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ktps-vii stage-adm-ss-gs-erection of poles and making ht/lt cut points at new bombay colony and other damaged lines in colony distribution i and ii sections of general service sub division in s and s division ktps vii stage
Ktps-vii stage-adm-ss-gs-erection of poles and making ht/lt cut points at new bombay colony and other damaged lines in colony distribution i and ii sections of general service sub division in s and s division ktps vii stage
Read moreRate contract for supply, erection, testing, commissioning for laying of lt line on 50mmsq, 70mmsq, 95mmsq and 120mmsq lt ab cable on 8/9 m pcc poles and st poles under ed-i for fy 2025-26 on turnkey basis
Rate contract for supply, erection, testing, commissioning for laying of lt line on 50mmsq, 70mmsq, 95mmsq and 120mmsq lt ab cable on 8/9 m pcc poles and st poles under ed-i for fy 2025-26 on turnkey basis
Read moreSupply, erection, testing and commissioning of 63 kva distribution substations along with laying of ht and lt line at chak chaban barrian of samba under jjm phe (wss)
Supply, erection, testing and commissioning of 63 kva distribution substations along with laying of ht and lt line at chak chaban barrian of samba under jjm phe (wss) within jurisdiction of executive engineer electric division vijaypur
Read moreErection testing commissioning of new 33kv 11kv lt lines distribution substations etc and other miscellaneous work on turnkey basis in rural urban areas of rewa district under onm circle rewa
Erection testing commissioning of new 33kv 11kv lt lines&#x0d distribution substations etc and other miscellaneous work on turnkey basis&#x0d in rural urban areas of rewa district under onm circle rewa
Read moreRate contract for erection, testing and commissioning for laying of 1 km ht xlpe cable 50 sqmm, 70 sqmm, 95 sqmm, 120 sqmm and 300 sqmm 3 core on 8/9mtr st poles under the ed-i parade, jammu for fy 2025-26 labour only.
Rate contract for erection, testing and commissioning for laying of 1 km ht xlpe cable 50 sqmm, 70 sqmm, 95 sqmm, 120 sqmm and 300 sqmm 3 core on 8/9mtr st poles under the ed-i parade, jammu for fy 2025-26 labour only.
Read moreRate contract for erection, testing and commissioning for laying of 1 km ht xlpe cable 50 sqmm, 70 sqmm, 95 sqmm, 120 sqmm and 300 sqmm 3 core on 8/9mtr pcc poles under the ed-i parade, jammu for fy 2025-26 labour only.
Rate contract for erection, testing and commissioning for laying of 1 km ht xlpe cable 50 sqmm, 70 sqmm, 95 sqmm, 120 sqmm and 300 sqmm 3 core on 8/9mtr pcc poles under the ed-i parade, jammu for fy 2025-26 labour only.
Read moreSpecifications and general instructions for the supply and delivery of top hampers for pcc poles 9 mtrs, to be used in ht/lt lines of distribution systems in punjab state power corporation limited.
The supply and delivery of top hampers for pcc poles 9 mtrs, to be used in ht/lt lines of distribution systems in punjab state power corporation limited.
Read moreOutsourcing of labour part for erection, testing and commissioning of new 11kvlt/ht lines on rail/pcc poles, distribution t/fs, augmentation/sagging of acsr of ht/lt lines, cables laying, guarding, stay set for various works such as releasing of t/we
Outsourcing of labour part for erection, testing and commissioning of new 11kvlt/ht lines on rail/pcc poles, distribution t/fs, augmentation/sagging of acsr of ht/lt lines, cables laying, guarding, stay set for various works such as releasing of t/we
Read moreE,t,and c of sc pump sets 3 nos of dtrs vcbs, soft ers, cables and dismantling of sc pump sets, cables ht lt panels and transformers whenever it is required emergency pumping from yellampally barrage to murmur intake well at murmur pumping station premises td-iv, control room
Erection testing and commissioning of 18nos x 125hp 90kw and 2nos x 100hp/ 75kw submersible centrifugal pump sets 3 no of 6.6kv/433v 1250kva distribution transformers (dtr)s 12kv 630a vcbs, 415v 1600a acbs soft ers cables and dismantling of 20nos x 125hp 100hp submersible centrifugal pump sets cables ht lt panels and transformers, whenever it is required emergency pumping from yellampally barrage to murmur intake well at murmur pumping station premises under gm(e) trans. division-iv control room.
Read moreErection/testing and commissioning of new 33kv/11kv/lt lines/distribution substations etc and other miscellaneous work, on turnkey basis in rural/urban areas of satna district and maihar distt. under onm circle, satna.
Erection/testing and commissioning of new 33kv/11kv/lt lines/distribution substations etc and other miscellaneous work, on turnkey basis in rural/urban areas of satna district&#x0d and maihar distt. under onm circle, satna.&#x0d &#x0d &#x0d
Read moreof your Industry type