Tender Details
Particulars | Details |
---|---|
Title |
Balance Work For Improvements Of Road From Nizamabad To Varni At Mosra (Vm) (Work In Reach From Km 16/250 To 16/640, 17/350 To 17/6) In Nizamabad District.(Sub Work Providing Road Safety Interventions)
|
Description |
Balance Work For Improvements Of Road From Nizamabad To Varni At Mosra (Vm) (Work In Reach From Km 16/250 To 16/640, 17/350 To 17/6) In Nizamabad District.(Sub Work Providing Road Safety Interventions)
|
Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
Tender Id | 544354 |
Reference Number |
04/2024-25, Dt:12.09.2024 |
Tender Fee | 409 |
EMD | 11600 |
Tender Value | |
Place | TS |
Link | http://eprocurement.telangana.gov.in/ |
Start Date | September 18, 2024 21:30 |
End Date |
25/09/2024 ( Expired 236 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreGopiballavpur nayagram road from 35.00 km to 41.60km
Gopiballavpur nayagram road from 35.00 km to 41.60km, strengthening work including reconstruction of 2 nos. cd structures and 215.00 m protective work under jhargram highway division in the district of jhargram.
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreRoutine maintenance including incident management (excluding ambulance services) and safety improvements for nellore bypass (4l length of 14.668 km) section of nh-16 and badvel to chunchuluru section (2l length 23.645 km) of nh-67 in the state of ap.
Routine maintenance including incident management (excluding ambulance services) and safety improvements for nellore bypass (4l length of 14.668 km) section of nh-16 and badvel to chunchuluru section (2l length 23.645 km) of nh-67 in the state of ap.
Read moreBalance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Read moreWork of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Read moreBalance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Read moreAAAAAAAAAA
Login to viewHabra ashoknagar bye pass road from 0.00 km to 0.030 km and from 0.320 km to 0.375 emergent repairing work by icbp under habra highway sub-division under barasat highway sub-division ii in the district of north 24 parganas
Read moreRenewal work by sdbc in vijaynager-pathalidhar motor road from km 2 to 8 augastyamuni block in district rudraprayag under annual repair.
Renewal work by sdbc in vijaynager-pathalidhar motor road from km 2 to 8 augastyamuni block in district rudraprayag under annual repair.
Read moreof your Industry type