Tender Details

Particulars Details
Title
Repairing Of Ht Feeder No. 22 (6.6 Kv Overhead Line) From Kc 2 Pit To Dharmaband Colliery Under Govindpur Area.
Description
Repairing Of Ht Feeder No. 22 (6.6 Kv Overhead Line) From Kc 2 Pit To Dharmaband Colliery Under Govindpur Area.
Organisation Bharat Coking Coal Limited | Public Sector Undertakings
Tender Id 2025_BCCL_332256_1
Reference
Number
BCCL/GA-III/AM (EnM) E-TENDER/2024-25/261
Tender Fee 0
EMD 2470
Tender Value
Place Govindpur Area Office
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=344436
Start Date March 14, 2025 16:30
End Date

18/03/2025 ( Expired 34 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)

Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)

Read more
Upgradation of rural road from nh-04 to kalsi village ward no. 1, at rangat, middle andaman under pmgsy-iii.

Upgradation of rural road from nh-04 to kalsi village ward no. 1, at rangat, middle andaman under pmgsy-iii.

Read more
Wbpwd/pw(r)/se/shc/nit no 02 of 2025-2026(2nd-call)

Herobhanga vidyasagar vidyamandir to jharkhali ferry ghat road, from 0.00 kmp to 3.80 kmp, widening and strengthening work under south 24-parganas highway division, p.w (roads) directorate in the district of south 24-parganas.

Read more
Manning for operation and maintenance of 185 mld narmada water supply project comprising hirani pumping station, khatpura pumping station, ahmadpur 132 kv pumping station, 6.6kv line from khatpura to hirani, 6.6kv line from khatpura to bpt, 33kv subs

Manning for operation and maintenance of 185 mld narmada water supply project comprising hirani pumping station, khatpura pumping station, ahmadpur 132 kv pumping station, 6.6kv line from khatpura to hirani, 6.6kv line from khatpura to bpt, 33kv subs

Read more
Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.

Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.

Read more
Supply of wcl security, category ii, listed and listed i for watch and ward services under oil operational area under oil pipeline services in the state of assam for a period of 04 years from 01.07.2025 to 30.06.2029.

Supply of wcl security, category ii, listed and listed i for watch and ward services under oil operational area under oil pipeline services in the state of assam for a period of 04 years from 01.07.2025 to 30.06.2029.

Read more
G.t. road (sh-2) from 674.35 km to 674.55 km, 675.20 km to 675.70 and 676.10 km to 676.36 km, strengthening work under howrah division in the district of howrah.

G.t. road (sh-2) from 674.35 km to 674.55 km, 675.20 km to 675.70 and 676.10 km to 676.36 km, strengthening work under howrah division in the district of howrah.

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Read more
Preparation of detailed project report, pre construction activity and supervision for the work of elevated flyover in dhanbad town from km-53(dhansar) on (nh-218) to govindpur on nh-19 (old nh-2) in the state of jharkhand

Preparation of detailed project report, pre construction activity and supervision for the work of elevated flyover in dhanbad town from km-53(dhansar) on (nh-218) to govindpur on nh-19 (old nh-2) in the state of jharkhand

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise