Tender Details
Particulars | Details |
---|---|
Title |
Repairing Of Ht Feeder No. 22 (6.6 Kv Overhead Line) From Kc 2 Pit To Dharmaband Colliery Under Govindpur Area.
|
Description |
Repairing Of Ht Feeder No. 22 (6.6 Kv Overhead Line) From Kc 2 Pit To Dharmaband Colliery Under Govindpur Area.
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2025_BCCL_332256_1 |
Reference Number |
BCCL/GA-III/AM (EnM) E-TENDER/2024-25/261 |
Tender Fee | 0 |
EMD | 2470 |
Tender Value | |
Place | Govindpur Area Office |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=344436 |
Start Date | March 14, 2025 16:30 |
End Date |
18/03/2025 ( Expired 34 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Read moreUpgradation of rural road from nh-04 to kalsi village ward no. 1, at rangat, middle andaman under pmgsy-iii.
Upgradation of rural road from nh-04 to kalsi village ward no. 1, at rangat, middle andaman under pmgsy-iii.
Read moreWbpwd/pw(r)/se/shc/nit no 02 of 2025-2026(2nd-call)
Herobhanga vidyasagar vidyamandir to jharkhali ferry ghat road, from 0.00 kmp to 3.80 kmp, widening and strengthening work under south 24-parganas highway division, p.w (roads) directorate in the district of south 24-parganas.
Read moreManning for operation and maintenance of 185 mld narmada water supply project comprising hirani pumping station, khatpura pumping station, ahmadpur 132 kv pumping station, 6.6kv line from khatpura to hirani, 6.6kv line from khatpura to bpt, 33kv subs
Manning for operation and maintenance of 185 mld narmada water supply project comprising hirani pumping station, khatpura pumping station, ahmadpur 132 kv pumping station, 6.6kv line from khatpura to hirani, 6.6kv line from khatpura to bpt, 33kv subs
Read moreConstruction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Read moreSupply of wcl security, category ii, listed and listed i for watch and ward services under oil operational area under oil pipeline services in the state of assam for a period of 04 years from 01.07.2025 to 30.06.2029.
Supply of wcl security, category ii, listed and listed i for watch and ward services under oil operational area under oil pipeline services in the state of assam for a period of 04 years from 01.07.2025 to 30.06.2029.
Read moreG.t. road (sh-2) from 674.35 km to 674.55 km, 675.20 km to 675.70 and 676.10 km to 676.36 km, strengthening work under howrah division in the district of howrah.
G.t. road (sh-2) from 674.35 km to 674.55 km, 675.20 km to 675.70 and 676.10 km to 676.36 km, strengthening work under howrah division in the district of howrah.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read morePreparation of detailed project report, pre construction activity and supervision for the work of elevated flyover in dhanbad town from km-53(dhansar) on (nh-218) to govindpur on nh-19 (old nh-2) in the state of jharkhand
Preparation of detailed project report, pre construction activity and supervision for the work of elevated flyover in dhanbad town from km-53(dhansar) on (nh-218) to govindpur on nh-19 (old nh-2) in the state of jharkhand
Read moreof your Industry type