Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Mill Plant Ac Plant Unit Iv Aoh 2024 25 Air Washer System Epoxy Painting Of Blowers Discharge Duct Spray System And Air Filter Platform Area Renewal Of Air Filter Overhauling The Awcw Pumps Gate Valve Spray Nozzles
|
Description |
Mtps I Mill Plant Ac Plant Unit Iv Aoh 2024 25 Air Washer System Epoxy Painting Of Blowers Discharge Duct Spray System And Air Filter Platform Area Renewal Of Air Filter Overhauling The Awcw Pumps Gate Valve Spray Nozzles
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_463120_1 |
Reference Number |
CE / MTPS-I / SE / M-I / MP /OT.95 / 2024-25 |
Tender Fee | 0 |
EMD | 3300 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=550383 |
Start Date | July 16, 2024 14:30 |
End Date |
22/07/2024 ( Expired 295 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i mill plant ac plant unit i aoh 2025 26 air washer system epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows w type eliminator chemical cleaning overhauling the awcw pumps
Mtps i mill plant ac plant unit i aoh 2025 26 air washer system epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows w type eliminator chemical cleaning overhauling the awcw pumps
Read moreMtps i bm dm plant unit i to iv aoh coh 2025 overhauling of hot well makeup pumps 8 nos and boiler fill pumps 4 nos
Mtps i bm dm plant unit i to iv aoh coh 2025 overhauling of hot well makeup pumps 8 nos and boiler fill pumps 4 nos
Read moreMtps i mill plant centralised ac plant attending breakdown works in ac compressor no 2 and 3 ac cooling tower fans air handling units air washer system circulating water pumps pipe lines and valves etc for a period of 365 days
Mtps i mill plant centralised ac plant attending breakdown works in ac compressor no 2 and 3 ac cooling tower fans air handling units air washer system circulating water pumps pipe lines and valves etc for a period of 365 days
Read moreMtps i mill plant ac plant replacement of existing damaged air duct outside the conference hall ahu room renewal of insulation extending supply air duct in ce office and providing down comer spool piece towards ups panels etc
Mtps i mill plant ac plant replacement of existing damaged air duct outside the conference hall ahu room renewal of insulation extending supply air duct in ce office and providing down comer spool piece towards ups panels etc
Read moreMtps i mill plant unit ii removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4.5 mtr 18 mtr level renewal of eroded worn out expansion joint welding of eroded 2c 2e 2f and worn out portion of hot air
Mtps i mill plant unit ii removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4.5 mtr 18 mtr level renewal of eroded worn out expansion joint welding of eroded 2c 2e 2f and worn out portion of hot air
Read moreMtps i mill plant ac plant unit ii coh 2024 25 air washer system epoxy painting of blowers, discharge duct spray system and air filter platform area replacing the damaged 200 nb gi header pipe vibration pads overhauling the blower 2
Mtps i mill plant ac plant unit ii coh 2024 25 air washer system epoxy painting of blowers, discharge duct spray system and air filter platform area replacing the damaged 200 nb gi header pipe vibration pads overhauling the blower 2
Read moreMtps i mill plant unit ii dismantling of seal air fan motor and overhauling reassembling setting the alignment of the motor with impeller dismantling cleaning of seal air filters and strengthening of seal air filter frame assembly
Mtps i mill plant unit ii dismantling of seal air fan motor and overhauling reassembling setting the alignment of the motor with impeller dismantling cleaning of seal air filters and strengthening of seal air filter frame assembly
Read moreMtps i mill plant unit ii overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seals during capital overhaul 2024 25
Mtps i mill plant unit ii overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder renewal of hot air gate seals during capital overhaul 2024 25
Read moreMtps 1 mill plant unit iv attending the break down prive maintenance works such as overhauling of gravimetric feeders mechanical face seal assembly renewal of vertical shaft thrust bearing worm shaft thrust and radial bearing airport
Mtps 1 mill plant unit iv attending the break down prive maintenance works such as overhauling of gravimetric feeders mechanical face seal assembly renewal of vertical shaft thrust bearing worm shaft thrust and radial bearing airport
Read moreMtps i mill plant ac plant air washer system renewal of existing damaged air grill discharge diffuser with volume control dampers in air ducts at various location of air washer system discharge duct of unit i to iv turbine floor battery charger
Mtps i mill plant ac plant air washer system renewal of existing damaged air grill discharge diffuser with volume control dampers in air ducts at various location of air washer system discharge duct of unit i to iv turbine floor battery charger
Read moreof your Industry type