Tender Details

Particulars Details
Title
Nit67 Transporation Of Water Through Tankers In Rwss In Bhinai Tehsil Under Div Kekri
Description
Nit67 Transporation Of Water Through Tankers In Rwss In Bhinai Tehsil Under Div Kekri
Organisation PHED-Chief Engineer(HQ),Jaipur | State Govt. and UT
Tender Id 2025_PHCJA_447848_6
Reference
Number
EEDNKEKRINIT62-67
Tender Fee 1000
EMD 30000
Tender Value
Place Kekri
Link https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=803990
Start Date February 13, 2025 23:30
End Date

27/02/2025 ( Expired 120 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham

Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham

Read more
Reconstruction of existing major bridge near manik nagar at km.99.225 on nh 50 bidar humnabad section in the state of karnataka under annual plan 2024 25 on epc mode

Reconstruction of existing major bridge near manik nagar at km.99.225 on nh 50 bidar humnabad section in the state of karnataka under annual plan 2024 25 on epc mode

Read more
Request for selection for setting up of 1000 mw/2000 mwh standalone battery energy systems under tariff based global competitive bidding in rajasthan with viability gap funding support under boo model.

Request for selection for setting up of 1000 &amp#x0d mw/2000 mwh standalone battery energy systems &amp#x0d under tariff based global competitive bidding in &amp#x0d rajasthan with viability gap funding support under boo model.

Read more
Widening of exist 2lane to 4 lane divided carriageway with paved shoulder from km 0.000 near deshgaon to km 51.579 (ex km 77.500 on sh26)of nh 347b near dewalgaon (l51.579kms)under nh(o) in madhya pradesh on ham

Widening of exist 2lane to 4 lane divided carriageway with paved shoulder from km 0.000 near deshgaon to km 51.579 (ex km 77.500 on sh26)of nh 347b near dewalgaon (l51.579kms)under nh(o) in madhya pradesh on ham

Read more
Widening of exist. 2lane to 4lane divided carriageway with paved shoulder from km 51.579 ex km 77.500 on sh26 near dewalgaon to km 108.643 km 129.900 on nh52 of nh 347b near julwaniya l57.064kms under nh(o) in madhya pradesh on ham

Widening of exist. 2lane to 4lane divided carriageway with paved shoulder from km 51.579 ex km 77.500 on sh26 near dewalgaon to km 108.643 km 129.900 on nh52 of nh 347b near julwaniya l57.064kms under nh(o) in madhya pradesh on ham

Read more
Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.

Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise