Tender Details
Particulars | Details |
---|---|
Title |
Work For Erection Of New 100 Kva Dtc For Darren Xavier Fernandes H.No.896(48/8), Camotiwaddo, Candolim Bardez Goa For A Total Load Of 28.57 Kw
|
Description |
Work For Erection Of New 100 Kva Dtc For Darren Xavier Fernandes H.No.896(48/8), Camotiwaddo, Candolim Bardez Goa For A Total Load Of 28.57 Kw
|
Organisation | ELECTRICITY DEPARTMENT | State Govt. and UT |
Tender Id | 2025_ED_19870_1 |
Reference Number |
tender 25(24-25)/DIV-VI/ DT 06/02/25 |
Tender Fee | 4851 |
EMD | 38505 |
Tender Value | |
Place | ELECTRICITY DEPT, Div-VI, MAPUSA |
Link | https://eprocure.goa.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=20304 |
Start Date | February 07, 2025 17:30 |
End Date |
14/02/2025 ( Expired 66 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
For erection of line and infrastructure relating to new connection (on jhatpat portal, nives mitra, and shifting work in the area of ee, uedd-chaukaghat, varanasi.
For erection of line and infrastructure relating to new connection (on jhatpat portal, nives mitra, and shifting work in the area of ee, uedd-chaukaghat, varanasi.
Read moreTender for the work of enhancement 1 no of dtc from 63kva to 200kva and 2 nos of dtcs from 100kva to 200kva for aps to 4 nos. ltd service connections under s.o. sankhali.
Tender for the work of enhancement 1 no of dtc from 63kva to 200kva and 2 nos of dtcs from 100kva to 200kva for aps to 4 nos. ltd service connections under s.o. sankhali.
Read moreTender for the work of enhancement of existing 200 kva dtc to 400 kva for arranging power supply to 1 no ltd connection to m s r bandekar and co pvt ltd wadachawada shirgao for a load of 18 02 kw in the jurisdiction of s o assonora under sdi bich
Tender for the work of enhancement of existing 200 kva dtc to 400 kva for arranging power supply to 1 no ltd connection to m s r bandekar and co pvt ltd wadachawada shirgao for a load of 18 02 kw in the jurisdiction of s o assonora under sdi bich
Read moreTender 02 (25-26) work for arranging lt power supply to the director of agriculture at codar farm for a load of 81.46 kw by erection of new 100 kva dtc under the jurisdiction of bethoda section office, sub-division-ii (ehv), division-x, ponda
Work for arranging lt power supply to the director of agriculture at codar farm for a load of 81.46 kw by erection of new 100 kva dtc under the jurisdiction of bethoda section office, sub-division-ii (ehv), division-x, ponda
Read moreTechnical estimate for providing power supply to 3 ph lt no. pww connection having requested load with erection of 25 kva 3 ph dt as per the request from the applicant in at 18 work tal. parola, dist. jalgaon
Technical estimate for providing power supply to 3 ph lt no. pww connection having requested load with erection of 25 kva 3 ph dt as per the request from the applicant in at 18 work tal. parola, dist. jalgaon
Read moreLaying of tower foundations erection of towers and stringing and sagging of acsr and htls conductor with earthwire for construction of 66 kv line to extend load of m/s kahna concast village ambey majra chattarpura road mandi gobindgarh deposit work
Laying of tower foundations erection of towers and stringing and sagging of acsr and htls conductor with earthwire for construction of 66 kv line to extend load of m/s kahna concast village ambey majra chattarpura road mandi gobindgarh deposit work
Read more1)work of erection of new 100kva dtc at saliswaddo parra in order to solve low voltage problem faced by the locals of saliswaddo and gamawaddo, parra work of erection of new 200kva dtc at sanqwadi arpora in order to solve low voltage problem faced
1)work of erection of new 100kva dtc at saliswaddo parra in order to solve low voltage problem faced by the locals of saliswaddo and gamawaddo, parra 2)work of erection of new 200kva dtc at sanqwadi arpora in order to solve low voltage problem faced
Read moreWork for releasing 09 nos of ltd service connections to mrs. sushma sameer gadekar and mr. sameer e. gadekar for a total load of 83.45kw, near sateri temple at haliwada, brittona
Work for releasing 09 nos of ltd service connections to mrs. sushma sameer gadekar and mr. sameer e. gadekar for a total load of 83.45kw, near sateri temple at haliwada, brittona
Read moreSupply erection and commissioning of new pumps for flood protection work in village baroda in w.s mech sub division gohana
Supply erection and commissioning of new pumps for flood protection work in village baroda in w.s mech sub division gohana
Read moreInterior design for the directorate of transports new office space located on the first floor of building b of the housing board new market complex in porvorim, goa (deposit work)
Interior design for the directorate of transports new office space located on the first floor of building b of the housing board new market complex in porvorim, goa (deposit work)
Read moreof your Industry type