Tender Details

Particulars Details
Title
Plastic Cover For 4 Aspect Signal Unit Cover Opened From Front Side And Bottom Side And Made Of Black Polythene Sheet Of 100 Micron Thickness
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 106570046
Reference
Number
95255005
Tender Fee 0
EMD 0
Tender Value
Place Mumbai CST
Link https://www.ireps.gov.in/ireps/supply/pdfdocs/012025/106570046/viewNitPdf_4824030.pdf
Start Date January 03, 2025 20:33
End Date

27/01/2025 ( Expired 105 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Sealing services for attending ash leakages from pent house/ wind box (inc material and man power) in annual overhaul (aoh) of the units for boiler of unit-2 2x600 mw, stage-i, and for boiler of unit-4 2x660 mw, stage-ii, sstpp, mppgcl, dongalia

Sealing services for attending ash leakages from pent house/ wind box (inc material and man power) in annual overhaul (aoh) of the units for boiler of unit-2 2x600 mw, stage-i, and for boiler of unit-4 2x660 mw, stage-ii, sstpp, mppgcl, dongalia

Read more
Repair renovation to ac plant by way of fabrication of aluminum cabin 19 x19x10 for operators working in ac plant and covering from front side of ac plant by way of providing and fitting of aluminum frame with double door of size 11x 8at ac plan

Repair renovation to ac plant by way of fabrication of aluminum cabin 19 x19x10 for operators working in ac plant and covering from front side of ac plant by way of providing and fitting of aluminum frame with double door of size 11x 8at ac plan

Read more
Nctps i se m ii ahp dn unit i attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site

Nctps i se m ii ahp dn unit i attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site

Read more
Nctps i se m ii ahp dn unit ii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site

Nctps i se m ii ahp dn unit ii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site

Read more
Patch welding to be done for rectification of damaged flue gas duct from aph-b hopper to chimeny along the path cd side flue gas duct and its honeycomb structure ( cd) after dismantling the damaged / worn out portion of flue gas ducts for overhaul of unit ix

Patch welding to be done for rectification of damaged flue gas duct from aph b hopper to chimeny along the path cd side flue gas duct and its honeycomb structure c and d after dismantling the damaged worn out portion of flue gas ducts for overhaul of unit ix

Read more
Patch welding to be done for rectification of damaged flue gas duct from aph-a hopper to chimeny along the path ab side flue gas duct and its honeycomb structure ( ab) after dismantling the damaged / worn out portion of flue gas ducts for overhaul of unit ix

Patch welding to be done for rectification of damaged flue gas duct from aph a hopper to chimeny along the path ab side flue gas duct and its honeycomb structure ( a and b) after dismantling the damaged worn out portion of flue gas ducts for overhaul of unit ix

Read more
Procurement of trapezoidal galvalume roof sheet colour coated side cladding sheet and galvanised z purlin for tnpl unit ii

Procurement of trapezoidal galvalume roof sheet colour coated side cladding sheet and galvanised z purlin for tnpl unit ii

Read more
Construction of farm pond with s/f hdpe plastic film / geo membran for farmpond lining 500 micron sheet , recharge shaft for aquifers and roof top water harvesting structure ps bayana

Construction of farm pond with s/f hdpe plastic film / geo membran for farmpond lining 500 micron sheet , recharge shaft for aquifers and roof top water harvesting structure ps bayana

Read more
Proposed modernization of 2nd floor part gf of branch office building at amritsar for shifting bo 150 unit 4 and so clia from existing rented premises

Proposed modernization of 2nd floor part gf of branch office building at amritsar for shifting bo 150 unit 4 and so clia from existing rented premises

Read more
Annual contract for providing cup lock metallic scaffolding in side and outside the boiler during annual overhauling of unit 1 to 4, ctpp, rvunl, chhabra

Annual contract for providing cup lock metallic scaffolding in side and outside the boiler during annual overhauling of unit 1 to 4, ctpp, rvunl, chhabra

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise