Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Boot High Ankle Pu Rubber Sole (Defence),Boot High Ankle Pu Rubber Sole (Defence)
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2025/B/6271952 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | May 26, 2025 17:10 |
| End Date |
Expired
02/06/2025
Expired 497 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Tender for supply of machineries for production of emulsion paints and modification of pu putty dispenser
Tender for supply of machineries for production of emulsion paints and modification of pu putty dispenser
Read moreDifferent sizes of rubber expansion joints (bellows) in water system of cam division of ktps-vi stage
Different sizes of rubber expansion joints (bellows) in water system of cam division of ktps-vi stage
Read moreSupply of various widths of 12 mm thick diamond-groove rubber lagging sheets with ceramic inserts for drive pulleys.
Supply of various widths of 12 mm thick diamond-groove rubber lagging sheets with ceramic inserts for drive pulleys.
Read moreOutsourcing of rubber lagging, cold vulcanizing joint and patch works for belts working at jvr chp, sathupally area for a period of 2 years
Outsourcing of rubber lagging, cold vulcanizing joint and patch works for belts working at jvr chp, sathupally area for a period of 2 years
Read moreSelection of battery energy storage system developer (bessd) for setting up of 500 mwh (125 mw for 4 hours) standalone battery energy storage system (bess) under tariff-based competitive bidding (tbcb) on ‘boot’ basis at land to be provided at kajra, distt. lakhisarai, bihar.
Selection of battery energy storage system developer (bessd) for setting up of 500 mwh (125 mw for 4 hours) standalone battery energy storage system (bess) under tariff-based competitive bidding (tbcb) on ‘boot’ basis at land to be provided at kajra, distt. lakhisarai, bihar.
Read moreProcurement of different sizes of rubber coated wooden balls for air release valves installed in 1tmc, 2tmc raw water supply scheme, circulating water (cw), station auxiliary cooling water (sacw) system at stpp, jaipur, mancherial, telangana
Procurement of different sizes of rubber coated wooden balls for air release valves installed in 1tmc, 2tmc raw water supply scheme, circulating water (cw), station auxiliary cooling water (sacw) system at stpp, jaipur, mancherial, telangana
Read moreof your Industry type