Tender Details
Particulars | Details |
---|---|
Title |
Sitc Of Free Cooling System For 44 Nos Bts Sites Under Phase Ix.2 Under Asansol Ba
|
Description |
Sitc Of Free Cooling System For 44 Nos Bts Sites Under Phase Ix.2 Under Asansol Ba
|
Organisation | Bharat Sanchar Nigam Limited (Govt of India Enterprise) | Public Sector Undertakings |
Tender Id | 2025_BSNL_233549_1 |
Reference Number |
12/BSNL ED-ASL/25-26 dated 24.04.2025 |
Tender Fee | 590 |
EMD | 15692 |
Tender Value | |
Place | Diff sites under ED-Asansol |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=264260 |
Start Date | April 24, 2025 20:00 |
End Date |
06/05/2025 ( Expired 7 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Phase-2 - driver and final stage amplifiers for 2 sets of
Phase-2 - driver and final stage amplifiers for 2 sets of
 iter icrf sources
Read moreImplementation of a turnkey project for providing voice and data network over ofc with futuristic plan for integration of surveillance equipments on 08 nos ib deployed units under ftr hq jammu
Implementation of a turnkey project for providing voice and data network over ofc with futuristic plan for integration of surveillance equipments on 08 nos ib deployed units under ftr hq jammu
Read morePkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreWbphed/02/bwn of se/cc of 2025-2026 sl.no.2
Different balance works related with six nos. pwss under khandaghosh block piplon guir punsur talun gopalbera ukhrid under durgapur sub-division of burdwan division, phe dte. district purba-bardhaman&#x0d &#x0d &#x0d &#x0d &#x0d
Read moreSupply of 19730 nos of non-vrs pressure type dus suitable for dispensing ms / hsd with 2 years warranty and 8 years camc
Supply of 19730 nos of non-vrs pressure type dus suitable for dispensing ms / hsd with 2 years warranty and 8 years camc.
Read moreConstruction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii
Construction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii&#x0d name of subwork- construction of 1000 mld intake pump house for jaipur an
Read moreProvision of pcc hard standing at cross lane 4-5, provision of stair case for emergency exist for qc department, 43 bldg and demolition of building nos. p 50b and p 59 (portion of rtc bldg) at naval dockyard, visakhapatnam under ge (i) dm, visakhapat
Provision of pcc hard standing at cross lane 4-5, provision of stair case for emergency exist for qc department, 43 bldg and demolition of building nos. p 50b and p 59 (portion of rtc bldg) at naval dockyard, visakhapatnam under ge (i) dm, visakhapat
Read moreConstruction of distribution system for 5177.98 ha. of cca including command area development (cad) of salandi left main canal from rd 59.970 km to 60.304 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project
Construction of distribution system&#x0d for 5177.98 ha. of cca including&#x0d command area development (cad)&#x0d of salandi left main canal from rd&#x0d 59.970 km to 60.304 km through&#x0d under ground pipe line irrigation&#x0d system (gravity flow) of abp
Read moreVac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 of phase-2 cmrl project including integration at occ level.
Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 including integration at occ level.
Read moreof your Industry type