Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Rprc246360 Steam Leak And Steam Trap Network Survey And Monitoring At Prp
|
| Description |
|
| Organisation | INDIAN OIL CORPORATION LIMITED | Ministry of Petroleum and Natural Gas |
| Tender Id | GEM/2024/B/5487361 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | October 09, 2024 21:01 |
| End Date |
Expired
23/10/2024
Expired 725 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Custom bid for services - rpnc265046 rate contract for survey & continuous monitoring of steam trap network at iocl-panipat naphtha cracker, panipat
Custom bid for services - rpnc265046 rate contract for survey & continuous monitoring of steam trap network at iocl-panipat naphtha cracker, panipat
Read moreBucket, inverted, steam trap, cs, nb-25mm,bucket, inverted, steam trap, cs, nb-40mm,steam trap, thermodynamic, ss, nb-20mm,steam trap, thermodynamic, ss, nb-25mm
Bucket, inverted, steam trap, cs, nb-25mm,bucket, inverted, steam trap, cs, nb-40mm,steam trap, thermodynamic, ss, nb-20mm,steam trap, thermodynamic, ss, nb-25mm
Read moreSteam trap td hp cmpt 5 vlv sw 20 nb,steam trap sw hp 20nb,steam trap thermodynamic utd120 20nb
Steam trap td hp cmpt 5 vlv sw 20 nb,steam trap sw hp 20nb,steam trap thermodynamic utd120 20nb
Read moreNetwork monitoring and performance management software
Network monitoring and performance management software
Read moreNetwork monitoring and performance management software
Network monitoring and performance management software
Read moreSteam trap, t dynamic, 3/4in, sw, td120, ibr,stm trp, a105n/216-wcb, tr-316, fl, 2in, 150,hp thermodynamic trap, 20mm,s-trap, t. dyn, a217wc6, 304, fl, 600, 3/4inibr
Steam trap, t dynamic, 3/4in, sw, td120, ibr,stm trp, a105n/216-wcb, tr-316, fl, 2in, 150,hp thermodynamic trap, 20mm,s-trap, t. dyn, a217wc6, 304, fl, 600, 3/4inibr
Read moreCat 6 pure copper wire indoor,rj45 connectors,wireless router,network gb switch 8 port,network switch 5 port gb switch,language learning portal,network monitoring and control software,subject learning portal
Cat 6 pure copper wire indoor,rj45 connectors,wireless router,network gb switch 8 port,network switch 5 port gb switch,language learning portal,network monitoring and control software,subject learning portal
Read moreGis related survey services - integrated wild buffalo conservation, monitoring, threat assessment, research support, gis analysis and community conservation support service forest 1:15000 community based survey pdf
Gis related survey services - integrated wild buffalo conservation, monitoring, threat assessment, research support, gis analysis and community conservation support service forest 1:15000 community based survey pdf
Read moreSr. no. 1 steam trap as spare for one to one replacement of existing equipment of following specification model pt 17 diagram no pe 211 07 r0 size 25 nb as per specification attached,sr. no. 2 steam trap as spare for one to one replacement of existing equipment of following specification model pt 17 diagram no pe 211 07 r0 size 15 nb as per specification attached,sr. no. 3 steam trap as spare for one to one replacement of existing equipment of following specification model pt 62 s 10 diagram no pe 211 04 r0 size 50 nb as per specification attached,sr. no. 4 steam trap as spare for one to one replacement of existing equipment of following specification model pt 62 s 4.5 diagram no pe 211 06 r0 size 25 nb as per specification attached,sr. no. 5 steam trap as spare for one to one replacement of existing equipment of following specification model pt 62 s 4.5 diagram no pe 211 05 r0 size 50 nb as per specification attached,sr. no. 6 steam trap as spare for one to one replacement of existing equipment of following
Sr. no. 1 steam trap as spare for one to one replacement of existing equipment of following specification model pt 17 diagram no pe 211 07 r0 size 25 nb as per specification attached,sr. no. 2 steam trap as spare for one to one replacement of existing equipment of following specification model pt 17 diagram no pe 211 07 r0 size 15 nb as per specification attached,sr. no. 3 steam trap as spare for one to one replacement of existing equipment of following specification model pt 62 s 10 diagram no pe 211 04 r0 size 50 nb as per specification attached,sr. no. 4 steam trap as spare for one to one replacement of existing equipment of following specification model pt 62 s 4.5 diagram no pe 211 06 r0 size 25 nb as per specification attached,sr. no. 5 steam trap as spare for one to one replacement of existing equipment of following specification model pt 62 s 4.5 diagram no pe 211 05 r0 size 50 nb as per specification attached,sr. no. 6 steam trap as spare for one to one replacement of existing equipment of following
Read moreSurvey and design of laying of sewer network in place of under size and damage sewerage network in ward 59 from krishna colony to vrindavan colony.
Survey and design of laying of sewer network in place of under size and damage sewerage network in ward 59 from krishna colony to vrindavan colony.
Read moreof your Industry type