Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Boundary Wall (Balance Length 2.5 Km) And Installation Of Concertina Coil Fencing (Loop 2) For Belora.
|
| Description |
Construction Of Boundary Wall (Balance Length 2.5 Km) And Installation Of Concertina Coil Fencing (Loop 2) For Belora.
|
| Organisation | Maharashtra Airport Development Co. Ltd. | State Govt. and UT |
| Tender Id | 2024_MADC_1127224_1 |
|
Reference Number |
2024_MADC_1067658_31 |
| Tender Fee | 5220 |
| EMD | 4.23 Lakh |
| Tender Value | |
| Place | Belora Airport Amravati |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1966666 |
| Start Date | December 21, 2024 14:30 |
| End Date |
Expired
09/01/2025
Expired 541 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair/ maintenance to fencing, barbed wire, concertina coil, painting over boundary walls and compound wall and other misc b/r works at tech area at af stn tezpur
Repair/ maintenance to fencing, barbed wire, concertina coil, painting over boundary walls and compound wall and other misc b/r works at tech area at af stn tezpur
Read moreBalance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, (length - 27.00 km)
Balance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, 
 (length - 27.00 km)
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreContract for repairing and maintenance of factory boundary wall for the year 2026-27 at rcf thal
Contract for repairing and maintenance of factory boundary wall for the year 2026-27 at rcf thal
Read moreBina- planning, designing, drawing & construction of ballastless track(up to 50 kmph speed) at bina station loop line number 1 and 2
For complete deion and other details, please refer to tender
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreConstruction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.
Construction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.
Read moreRepair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Read moreDesign, supply, installation, testing and commissioning of 2 tpd capacity bio-methanation plant for iit roorkee campus
Design, supply, installation, testing and commissioning of 2 tpd capacity bio-methanation plant for iit roorkee campus
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreof your Industry type