Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing Floor Flooring To Smashan Bhumi At Village Umri Tq. Ardhapur Dist. Nanded
|
| Description |
Providing Floor Flooring To Smashan Bhumi At Village Umri Tq. Ardhapur Dist. Nanded
|
| Organisation | RDD-CEO-NANDED | State Govt. and UT |
| Tender Id | 2025_NANDE_1188515_1 |
|
Reference Number |
ET/GP/UMARI/01/2025-26 |
| Tender Fee | 600 |
| EMD | 5000 |
| Tender Value | - |
| Place | Gram Panchayat At Umri Tq. Ardhapur Dist. Nanded |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2061679 |
| Start Date | June 10, 2025 18:30 |
| End Date |
Expired
16/06/2025
Expired 484 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
General-nalanda hostel-maintenance of rooms at second floor-maintenance of rooms at second floor including painting flooring and cupboard works
General-nalanda hostel-maintenance of rooms at second floor-maintenance of rooms at second floor including painting flooring and cupboard works
Read moreWall panelling wooden flooring and false ceiling works swayam library first floor cutn academic campus
Wall panelling wooden flooring and false ceiling works swayam library first floor cutn academic campus
Read moreSpecial repairs to first floor and ground floor flooring, false ceiling, painting and sanitary arrangements in collector camp office in mpc at tiruvannamalai in tiruvannamalai district
Special repairs to first floor and ground floor flooring, false ceiling, painting and sanitary arrangements in collector camp office in mpc at tiruvannamalai in tiruvannamalai district
Read moreGrinding and polishing of existing kota stone flooring at 17.0 mtr. tg floor in front of main control room, csctpp, chhabra
Grinding and polishing of existing kota stone flooring at 17.0 mtr. tg floor in front of main control room, csctpp, chhabra
Read moreSpecial repairs to flooring, doors, windows, painting and other civil works pa(pd) office in first floor at collectorate building at thiruvallur district.
Special repairs to flooring, doors, windows, painting and other civil works pa(pd) office in first floor at collectorate building at thiruvallur district.
Read moreProviding and fixing external vitrified floor tiles at ground floor corridor, natural stone flooring at porch, fixing pvc gutter to existing gi sheet roofing sheet and other allied works at aneexe building, cpmg office, trivandrum.
Providing and fixing external vitrified floor tiles at ground floor corridor, natural stone flooring at porch, fixing pvc gutter to existing gi sheet roofing sheet and other allied works at aneexe building, cpmg office, trivandrum.
Read moreUpgradation of ground floor in rcrqa by way of kota stone flooring under nutritional and functional food analysis laboratory at main campus shalimar, skuast-k.
Upgradation of ground floor in rcrqa by way of kota stone flooring under nutritional and functional food analysis laboratory at main campus shalimar, skuast-k.
Read moreColouring,painting ,repiars to flooring ,water supply sanitary arrangement and misc. repairs works at old building right wing and left wing (ground floor) at vidhanbhavan, nagpur..
Colouring,painting ,repiars to flooring ,water supply sanitary arrangement and misc. repairs works at old building right wing and left wing (ground floor) at vidhanbhavan, nagpur..
Read moreDismantling old plaster,dismantling tile work,supplying and fixing movable,providing and applying gypsum-based punning,providing and applying white cement,providing and applying priming,wall painting with acrylic,providing and laying ceramic glazed floor tiles,providing and laying in position cement concrete,dismantling and removing existing wooden flooring,providing and fixing wooden sub-base floor,providing and fixing 4.5 mm thick pvc vinyl flooring,supplying and fixing movable badminton posts
Dismantling old plaster,dismantling tile work,supplying and fixing movable,providing and applying gypsum-based punning,providing and applying white cement,providing and applying priming,wall painting with acrylic,providing and laying ceramic glazed floor tiles,providing and laying in position cement concrete,dismantling and removing existing wooden flooring,providing and fixing wooden sub-base floor,providing and fixing 4.5 mm thick pvc vinyl flooring,supplying and fixing movable badminton posts
Read moreSupply and plastering the damaged area of ceiling wall terrace with labour and transportation for room no 101 102 103 201 and 202,supply and painting of emulsion paint with smooth putty primer as per the approved colours for room no 101 102 103 201 202 and steps area from ground floor to second floor including pathway,electrical work, led 2 x2, 1 x 1 ft lights havells crompton creaves led fitting exhaust fan 1 nos with necessary electrical cable with labour and transportation for room no 101 102 103 201 and 202,supply and installation of mosquito net with frame with labour and transportation for room no 101 102 103 201 and 202 and pantry,supply and installation of bath fittings and all accessories parry ware at rest room with labour and transportation for room no 101 102 103 201 and 202,supply and installation of ro with electrical and plumbing lines with labour and transportation,supply and laying of vitrified tiles for wall and flooring including cpvc plumbing lines with all accessories by removing the exis
Supply and plastering the damaged area of ceiling wall terrace with labour and transportation for room no 101 102 103 201 and 202,supply and painting of emulsion paint with smooth putty primer as per the approved colours for room no 101 102 103 201 202 and steps area from ground floor to second floor including pathway,electrical work, led 2 x2, 1 x 1 ft lights havells crompton creaves led fitting exhaust fan 1 nos with necessary electrical cable with labour and transportation for room no 101 102 103 201 and 202,supply and installation of mosquito net with frame with labour and transportation for room no 101 102 103 201 and 202 and pantry,supply and installation of bath fittings and all accessories parry ware at rest room with labour and transportation for room no 101 102 103 201 and 202,supply and installation of ro with electrical and plumbing lines with labour and transportation,supply and laying of vitrified tiles for wall and flooring including cpvc plumbing lines with all accessories by removing the exis
Read moreof your Industry type