Tender Details
Particulars | Details |
---|---|
Title |
Assistance For Cleaning And Lump/Over Size Coal/Hard Shell Coal Picking And Removal Around 1000 Tph Semi Mobile Crusher, Ac 4 Feeder Breaker, Ac 5 Feeder Breaker, Chp Phase I And Other Miscellaneous Works Of Chp, Kocp.
|
Description |
Assistance For Cleaning And Lump/Over Size Coal/Hard Shell Coal Picking And Removal Around 1000 Tph Semi Mobile Crusher, Ac 4 Feeder Breaker, Ac 5 Feeder Breaker, Chp Phase I And Other Miscellaneous Works Of Chp, Kocp.
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_SECL_303835_1 |
Reference Number |
SECL/GM/KSM/EnM/ eTender/23-24/74 |
Tender Fee | 0 |
EMD | 15600 |
Tender Value | |
Place | KUSMUNDA OPEN CAST PROJECT |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=314734 |
Start Date | March 07, 2024 16:30 |
End Date |
19/03/2024 ( Expired 448 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Picking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5metres per second pertains to stage-3 4 of chp, transport of shale to dump yard within the premises of chp (distance: 0 to 5 km) and cleaning of drains at crushed stock yards of stg-34 as and when required during the period from 01.04.2025 or commencement of the work to 31.03.2026
Picking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5metres per second pertains to stage-3 4 of chp, transport of shale to dump yard within the premises of chp (distance: 0 to 5 km) and cleaning of drains at crushed stock yards of stg-34 as and when required during the period from 01.04.2025 or commencement of the work to 31.03.2026
Read moreProviding assistance at different chutes, location transfer points for uninterrupted coal conveyance from wagon tipplers 5 6 to crushers crusher to bunkers due to complete wet coal and providing of labour charges for breaking and clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 56 grid hoppers in operation division /chp/stage- iiiiv /dr.nttps as and when required, during the period from
Providing assistance at different chutes, location transfer points for uninterrupted coal conveyance from wagon tipplers 5 6 to crushers crusher to bunkers due to complete wet coal and providing of labour charges for breaking and clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 56 grid hoppers in operation division /chp/stage- iiiiv /dr.nttps as and when required, during the period from 01.04.2025 or from the date of commencement of work to 31.03.2026 or till the exhaust of quantities.
Read moreRemoval and cleaning of hard and jammed coal, coal lumps,fines etc spilled from feeder breaker and belt conveyor accumulated in and around conveyor structure, below and inside of conveyor gallery of nadkhurkee f/b under abocp mine block - ii area
Removal and cleaning of hard and jammed coal, coal lumps,fines etc spilled from feeder breaker and belt conveyor accumulated in and around conveyor structure, below and inside of conveyor gallery of nadkhurkee f/b under abocp mine block - ii area
Read moreMechanical assistance with manpower for cleaning of oversize coal/shale lump, slush, overflown materials etc. from the trs 2 and trs 3 of chp phase-ii/ other related works at chp, kocp for a period of 360 days.
Mechanical assistance with manpower for cleaning of oversize coal/shale lump, slush, overflown materials etc. from the trs 2 and trs 3 of chp phase-ii/ other related works at chp, kocp for a period of 360 days.
Read moreFencing all along the running conveyors of chp phase-1, ac-4 feeder breaker, ac-5 feeder breaker and 1000 tph semi-mobile crusher
Fencing all along the running conveyors of chp phase-1, ac-4 feeder breaker, ac-5 feeder breaker and 1000 tph semi-mobile crusher
Read moreFixing of cutting bits and cutting bit holders on primary crusher roll assembly of departmental semi-mobile crusher (1000 tph) of mini chp at dipka expansion project.
Fixing of cutting bits and cutting bit holders on primary crusher roll assembly of departmental semi-mobile crusher (1000 tph) of mini chp at dipka expansion project.
Read moreAssistance in major shutdown/prive maintenance/ breakdown work at various locations of conveyors, 20,000 te. bunker and trs-1 sections of new chp phase-1 and ac-4 feeder breaker for a period of 365 days on as and when required basis at kocp.
Assistance in major shutdown/prive maintenance/ breakdown work at various locations of conveyors, 20,000 te. bunker and trs-1 sections of new chp phase-1 and ac-4 feeder breaker for a period of 365 days on as and when required basis at kocp.
Read moreFixing of cutting bits and cutting bit holders on primary crusher roll assembly of departmental semi-mobile crusher (1000 tph) of mini chp at dipka expansion project.
Fixing of cutting bits and cutting bit holders on primary crusher roll assembly of departmental semi-mobile crusher (1000 tph) of mini chp at dipka expansion project.
Read moreAssistance for cleaning and lump/over size coal/hard shell coal picking and removal around 1000 tph semi mobile crusher, ac-4 feeder breaker, ac-5 feeder breaker, chp phase-i and other miscellaneous works of chp, kocp.
Assistance for cleaning and lump/over size coal/hard shell coal picking and removal around 1000 tph semi mobile crusher, ac-4 feeder breaker, ac-5 feeder breaker, chp phase-i and other miscellaneous works of chp, kocp.
Read moreAssistance in operation, maintenance, cleaning and up-keep of 1000 tph semi-mobile crusher unit with associated belt conveyors, swivel structure etc. including providing of consumables for a period of one year at dipka expansion project.
Assistance in operation, maintenance, cleaning and up-keep of 1000 tph semi-mobile crusher unit with associated belt conveyors, swivel structure etc. including providing of consumables for a period of one year at dipka expansion project.
Read moreof your Industry type