Tender Details
Particulars | Details |
---|---|
Title |
Providing Dwf Through 100 Fht Cs To Akkayapalem Habitaion Of Mentada Gp Of Ranasthalam Mandal In Srikakulam District
|
Description |
Providing Dwf Through 100 Fht Cs To Akkayyapalem Habitation Of Mentada Gp Of Ranastalam Mandal In Srikakulam District
|
Organisation | Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT |
Tender Id | 799401 |
Reference Number |
608/2024-25, dt.18.03.2025 |
Tender Fee | 753 |
EMD | 21300 |
Tender Value | |
Place | AP |
Link | https://tender.apeprocurement.gov.in |
Start Date | April 10, 2025 16:30 |
End Date |
15/04/2025 ( Expired 28 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
Read moreProviding road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Read moreMaintaining the buildings, sweeping of roads and plucking of grass in switch yard area and maintaining the plants and lawns at 400 kv ss suryapet in yadadri-bhongirir district for the period from 01.06.2025 to 31.03.2026 in omc, nalgonda
Maintaining the buildings, sweeping of roads and plucking of grass in switch yard area and maintaining the plants and lawns at 400kv ss suryapet in yadadri-bhongir district for the period from 01.06.2025 to 31.03.2026 in omc, nalgonda
Read moreConstruction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Read moreDesign and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Design and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Read moreRfp for protective treatment works of landslide zone in varandh ghat section in km 90.180 to 90.260 and km 94.150 to 96.600 on nh-965 dd in raigad district in the state of maharashtra
Rfp for protective treatment works of landslide zone in varandh ghat section in km 90.180 to 90.260 and km 94.150 to 96.600 on nh-965 dd in raigad district in the state of maharashtra
Read moreStrengthening of existing stretch from km 101/880 to 105/300 of nh-167bg inkavali town along with one-time improvement of bypassed stretch of jaladanki town from km 91/770 to 94/300 on epc mode in spsr nellore district in the state of andhra pradesh
Strengthening of existing stretch from km 101/880 to 105/300 of nh-167bg inkavali town along with one-time improvement of bypassed stretch of jaladanki town from km 91/770 to 94/300 on epc mode in spsr nellore district in the state of andhra pradesh
Read moreSized coal preparation by manual breaking and through coal crusher in gas plant/ffp subject to availability of rom coal
Sized coal preparation by manual breaking and through coal crusher in gas plant/ffp subject to availability of rom coal
Read moreConstruction of road from wangti to bp 150, from km 0.000 to km 5.700 (net length 5.700 km) to nhsl specifications under 100 rcc/15 brtf in nagaland state
Construction of road from wangti to bp 150, from km 0.000 to km 5.700 (net length 5.700 km) to nhsl specifications under 100 rcc/15 brtf in nagaland state
Read moreProviding life insurance benefits for the employees workmen for the period from 31.07.2025 to 30.07.2026 under group insurance scheme in lieu of employees deposit linked insurance scheme as per epf mp act 1952
Providing life insurance benefits for the employees workmen for the period from 31.07.2025 to 30.07.2026 under group insurance scheme in lieu of employees deposit linked insurance scheme as per epf mp act 1952
Read moreof your Industry type