Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Invitation For Bids: Scr Construction Organisation Project 🏗️ The Ministry Of Railways, Central Government, Invites Bids For The Completion Of Leftover Works Of Foot Over Bridges (Fo Bs) At Chintalpalli, Yelgur, And Nekonda Stations, As Well As Rail Over Rail (Ror) Works At Gunadala And Mustabada Stations, Within The Kazipet Vijayawada Section. This Project Also Includes Associated Miscellaneous Works As Part Of The 3rd Line Works From Kzj To Ki. 📅 Bid Submission Deadline: July 12, 2024, 3:00 Pm A Bid Security Of Inr 4,40,700 Is Required. No Tender Fee Is Payable. Interested Bidders Should Review The Complete Tender Document For Detailed Project Specifications, Scope, And Submission Guidelines. Keywords: Scr Construction Organisation, Ministry Of Railways, Foot Over Bridges, Rail Over Rail, Miscellaneous Works, Infrastructure Project, Government Tender, Bid, Emd| Particulars | Details |
|---|---|
| Title |
Scr Construction Organisation Kazipet Vijayawada Section Leftover Works Of Fo Bs At Chintalpalli, Yelgur And Nekonda Stations Of Kzj Ki 3rd Line Works And Gunadala And Mustabada Stations Of Rail Over Rail Works At Vijayawada And Connected Miscellaneous Works.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 75120711 |
|
Reference Number |
20-CAO-C-SC-2024 |
| Tender Fee | 0 |
| EMD | 4.41 Lakh |
| Tender Value | |
| Place | Secunderabad |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/072024/75120711/viewNitPdf_4570388.pdf |
| Start Date | June 21, 2024 00:40 |
| End Date |
Expired
12/07/2024
Expired 695 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 11kv oh line using raccoon and installation of 100kva tfr at adukkam under electrical section cherkala
Construction of 11kv oh line using raccoon and installation of 100kva tfr at adukkam under electrical section cherkala
Read moreShifting of htoh line along the roadside of purulia barakar road at gosala more due to construction of rob bridge and widening of road over railway crossing under purulia division
Shifting of htoh line along the roadside of purulia barakar road at gosala more due to construction of rob bridge and widening of road over railway crossing under purulia division
Read moreInvestigation, design and construction of civil structure (sub structure and super structure) works for spire , parking ring, roof, approach bridges over palavagu, shallow water around the legislative assembly building including earthwork, pile or raft foundations, rcc framed structure consisting of retaining wall, shear/core wall, slabs, beam, pt slab and beam inclined/flared shear walls, columns, using modular/system / fair finish/express formwork,, reinforcement works, waterproofing and
Investigation, design and construction of civil structure (sub structure and super structure) works for spire , parking ring, roof, approach bridges over palavagu, shallow water around the legislative assembly building including earthwork, pile or raft foundations, rcc framed structure consisting of retaining wall, shear/core wall, slabs, beam, pt slab and beam inclined/flared shear walls, columns, using modular/system / fair finish/express formwork,, reinforcement works, waterproofing and miscellaneous works for legislative assembly building in super block e of amaravati government complex area in amaravati capital city, andhra pradesh on lump sum contract (percentage tender) system
Read moreScr construction organisation - kazipet - vijayawada section - proposed 3rd line with electrification between kazipet - kondapalli stations - maintenance of newly opened 3rd line & byepass line tracks from ch:369000.00m to ch:376000.000m(7.00km7.0km= 14.00km) between kazipet (kzj) and warangal (wl) stations (excluding both yards)
For complete deion and other details, please refer to tender
Read moreScr construction organisation - kazipet - balharshah section - proposed 3rd line with electrification between kazipet - balharshah stations - maintenance of newly opened 3rd line & byepass line tracks from ch:356000.00m to ch:365000.000m(9.00km9.0km= 18.00km) between hasanparti road (hsp) and kazipet (kzj) stations (excluding both yards)
For complete deion and other details, please refer to tender
Read moreScr construction organisation - kazipet - balharshah section - proposed 3rd line with electrification between kazipet - balharshah stations - maintenance of newly opened 3rd line track from ch:214653.00m to ch:233711.00m(19.058kms) between asifabad road (asaf) and rechini road (rech) stations (including both yards).
For complete deion and other details, please refer to tender
Read moreScr construction organisation - sc division - proposed 3rd line between kazipet - balharshah stations - proposed bellampalli station yard remodeling & connected miscellaneous works on approaches of bellampalli station yard and other miscellaneous balance works between mandamarri (including) - rechni road (excluding) and asifabad road (excluding) - sirpurkaghaznagar (excluding) stations.
For complete deion and other details, please refer to tender
Read moreScr construction organisation- kazipet-vijayawada section - balance works of rub at lc no.106 such as launching of precast rcc boxes of size 1x5.0mx4.0m for sub way in lieu of lc no.106 at km 489/13-15 by providing rh girder duly excavation hard rock to the required level under traffic conditions etc. between khammam and pandilla palli stations.
For complete deion and other details, please refer to tender
Read moreSurvey, design, supply, installation, testing and commissioning of trackside kavach equipment at station/lc/ib/abs hut locations and associated works in balharshah (from center line towards kzj) - kazipet bypass - nwbh (excluding vijayawada) section (hdn5 route) of south central railway
For complete deion and other details, please refer to tender
Read moreScr construction organization- kzj-bpq section - proposed construction of 3rd line with electrification between kazipet - balharshah stations - last mile connectivity works in commissioning of sections between (a). balharshah (bpq) - manikgarh (magh) section in maharastra state and (b). rechni road(rech) - bellampalli (bpa) section in telangana state - additional quantity of supplying and stacking machine crushed clean, hard, angular and durable stone ballast -reg.
For complete deion and other details, please refer to tender
Read moreof your Industry type