Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repair Works To The Existing Drain In The East Side Of 457.5 E Road From Ch 175m To Ch 325m From Cad Mechanical Sub Division To Foph Unit 4 And 5
|
| Description |
Repair Works To The Existing Drain In The&Amp#X0d
East Side Of 457.5 E Road From Ch 175m To Ch 325m From Cad&Amp#X0d
Mechanical Sub Division To Foph Unit 4 And 5
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_622837_1 |
|
Reference Number |
CE SE C TTPS 337 2025 26 |
| Tender Fee | 0 |
| EMD | 3200 |
| Tender Value | - |
| Place | Tuticorin Thermal Power Station |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=744771 |
| Start Date | November 12, 2025 23:30 |
| End Date |
Expired
01/12/2025
Expired 319 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Replacement of old existing vcbs at varanasi cantt under ge (east) prayagraj.
Replacement of old existing vcbs at varanasi cantt under ge (east) prayagraj.
Read moreGeneral kip action plan 2026 27 annual maintenance of lbmc from ch 13500m to 26129m and melila east distributary from ch 0m to 13800m jungle clearing at nellippally campus and urgent cc lining work at ch 4500m of melila east distributary general civi
General kip action plan 2026 27 annual maintenance of lbmc from ch 13500m to 26129m and melila east distributary from ch 0m to 13800m jungle clearing at nellippally campus and urgent cc lining work at ch 4500m of melila east distributary general civi
Read moreIndependent engineer services for supervision of (i) 4 - laning of existing 2- lane galgalia-bahadurganj section from design ch. 0.000 to design ch. 49.000 (ii) 4 - laning of existing 2- lane bahadurganj - araria section design ch. 49.000 t
Independent engineer services for supervision of (i) 4 - laning of existing 2- lane galgalia-bahadurganj section from design ch. 0.000 to design ch. 49.000 (ii) 4 - laning of existing 2- lane bahadurganj - araria section design ch. 49.000 t
Read moreAnsys cfd pre-post,ansys mechanical pre-post,ansys mechanical solver,ansys cfd enterprise solver,ansys hpc pack,upgrade of existing ls dyna,icepack,sherlock
Ansys cfd pre-post,ansys mechanical pre-post,ansys mechanical solver,ansys cfd enterprise solver,ansys hpc pack,upgrade of existing ls dyna,icepack,sherlock
Read moreSpecial repair work rectification of major curve on nh-58 (beawar-gomti section) from existing ch. 168.500 to existing ch. 169.900 (lambodi village) and road safety works from km. 108.600 to 173.300 in state of rajasthan
Special repair work rectification of major curve on nh-58 (beawar-gomti section) from existing ch. 168.500 to existing ch. 169.900 (lambodi village) and road safety works from km. 108.600 to 173.300 in state of rajasthan
Read moreGeneral plan work 2025 26 melila east distributory rectification work of melila east distributory urgent leak arresting work of canal portions between ch 4500m to 5250m general civil work
General plan work 2025 26 melila east distributory rectification work of melila east distributory urgent leak arresting work of canal portions between ch 4500m to 5250m general civil work
Read moreGeneral-pvip-urgent rectification work for preventing leakage near ch 8/450km of kodanad east branch canal-general civil work
General-pvip-urgent rectification work for preventing leakage near ch 8/450km of kodanad east branch canal-general civil work
Read moreDesilting of existing channel using robotic excavator in north, east, south zone for a period of 6 months
Desilting of existing channel using robotic excavator in north, east, south zone for a period of 6 months
Read moreUpgradation of existing highway to 4 laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode.
Upgradation of existing highway to 4 laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode.
Read moreReconstruction of existing damaged storm water drain and culvert at tagore nagar extension in ward no 57, east zone
Reconstruction of existing damaged storm water drain and culvert at tagore nagar extension in ward no 57, east zone
Read moreof your Industry type