Tender Details
Particulars | Details |
---|---|
Title |
Maintenance Of Staff Quarter, Imsd/Imd, Station Building And Other Service Buildings In Between
New Khurja To New Bhaupur Section Of Cgm/Tdl Under Edfc
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 79207100 |
Reference Number |
TDL-EN-BPUN-KRJN-BM-24-25 |
Tender Fee | 11800 |
EMD | 2.74 Lakh |
Tender Value | |
Place | New Delhi |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/012025/79207100/viewNitPdf_4816356.pdf |
Start Date | January 08, 2025 18:02 |
End Date |
29/01/2025 ( Expired 83 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConstruction of service road and slip road between km450.170 to km 471.300 zarap to patradevi section of nh.66 in the state of maharashtra on epc mode
Construction of service road and slip road between km450.170 to km 471.300 zarap to patradevi section of nh.66 in the state of maharashtra on epc mode
Read moreRehabilitation of damaged cement concrete pavement, bridge repair and all other works which are not performed during maintenance period in km. 11.600 to 16.00 km. 34.00 to 39.00 and km. 57.00 to 62.00 nashik to state border nashik peth kaparada nh
Rehabilitation of damaged cement concrete pavement, bridge repair and all other works which are not performed during maintenance period in km. 11.600 to 16.00 km. 34.00 to 39.00 and km. 57.00 to 62.00 nashik to state border nashik peth kaparada nh
Read moreOperation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Read moreLong term rectification of morth identified blackspots by construction of lvup vup n fob under the project maharashtra karnataka border sangareddy section of nh65from km.352.188 to km.497.174 in the state of karnataka and telangana
Long term rectification of morth identified blackspots by construction of lvup vup n fob under the project maharashtra karnataka border sangareddy section of nh65from km.352.188 to km.497.174 in the state of karnataka and telangana
Read morePreparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Preparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreRepair and maintenance of pune solapur km 14 000 to km 40 000 and installation of streetlights km 40 000 km 150 050 section of nh 65 old nh 9 in the state of maharashtra
Repair and maintenance of pune solapur km 14 000 to km 40 000 and installation of streetlights km 40 000 km 150 050 section of nh 65 old nh 9 in the state of maharashtra
Read moreIndependent engineer services during operation and maintenance of six-laning of nh-71 from renigunta (km. 0.000) to naidupeta (km.57.046) (length-57.046 km.) on hybrid annuity mode in the state of andhra pradesh under bharatmala pariyojana.
Independent engineer services during operation and maintenance of six-laning of nh-71 from renigunta (km. 0.000) to naidupeta (km.57.046) (length-57.046 km.) on hybrid annuity mode in the state of andhra pradesh under bharatmala pariyojana.
Read moreof your Industry type