Tender Details

Particulars Details
Title
Nuppl Gtpp Sealing Of Unit 2 Boiler First Pass Bottom "S" Panel Opening
Description
Nuppl Gtpp Sealing Of Unit 2 Boiler First Pass Bottom "S" Panel Opening
Organisation Neyveli Uttar Pradesh Power Limited (NUPPL) | Public Sector Undertakings
Tender Id 2324020029
Reference
Number
2324020029
Tender Fee 0
EMD 16000
Tender Value -
Place Kanpur
Link
View Original Tender Notice

https://procure.nlcindia.in/specification/tender/2324020029

Start Date January 27, 2024 23:00
End Date
Expired 03/02/2024

Expired 989 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Bmc for certain non-plant buildings, outside roads including monsoon preparedness works at gtpp

Bmc for certain non-plant buildings, outside roads including monsoon preparedness works at gtpp

Read more
Panel door set top and bottom complete

Panel door set top and bottom complete

Read more
Supply of top and bottom casing for boiler feed booster pump

Supply of top and bottom casing for boiler feed booster pump

Read more
Ttps mech ii bm unit iii replacement of boiler pressure parts tubes bends i pass ii pass in unit-iii boiler during overhaul for the year 2026 2027

Ttps mech ii bm unit iii replacement of boiler pressure parts tubes bends i pass ii pass in unit-iii boiler during overhaul for the year 2026 2027

Read more
Ttps mech ii bm unit i replacement of boiler pressure parts tubes bends in screen tube and coutant bottom area in unit i boiler

Ttps mech ii bm unit i replacement of boiler pressure parts tubes bends in screen tube and coutant bottom area in unit i boiler

Read more
Annual service contract for cable laying, jointing, termination, supply and fixing of cable glands, earthing strips and panel bottom fire sealing works related to c and i, dept.at bktpp for two(02)years.

Annual service contract for cable laying, jointing, termination, supply and fixing of cable glands, earthing strips and panel bottom fire sealing works related to c and i, dept.at bktpp for two(02)years.

Read more
Ttps mech ii bm unit v drum inspection cleaning of drum internals doors overhauling of phosphate dozing system water washing and cleaning of i pass furnace ii pass boiler structure by water jet in unit v boiler during overhaul for the year 2026 2027

Ttps mech ii bm unit v drum inspection cleaning of drum internals doors overhauling of phosphate dozing system water washing and cleaning of i pass furnace ii pass boiler structure by water jet in unit v boiler during overhaul for the year 2026 2027

Read more
Boiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification

Boiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification

Read more
Automatic electric steam boiler,steam pipe,hot water generator,hpt machine with safety testing cage,base bleed unit bbu machine with opening tool kit

Automatic electric steam boiler,steam pipe,hot water generator,hpt machine with safety testing cage,base bleed unit bbu machine with opening tool kit

Read more
Removal of technological waste from boiler furnace seal area, cpp dry ash silo system area including compressor and panel room, seal air blower room and air compressor room of cpp boiler

Removal of technological waste from boiler furnace seal area, cpp dry ash silo system area including compressor and panel room, seal air blower room and air compressor room of cpp boiler

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise