Tender Details
Particulars | Details |
---|---|
Title |
Removal Of Existing Single Arm Davit 1.5 Ton And Install New Single Arm Davit Supplied By In On Ins Jamuna
|
Description |
Removal Of Existing Single Arm Davit 1.5 Ton And Install New Single Arm Davit Supplied By In On Ins Jamuna
|
Organisation | Hindustan Shipyard Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 525 |
EMD | 10000 |
Tender Value | |
Place | HSL Visakhapatnam |
Link |
AAAAAAAAAA Login to view |
Start Date | April 18, 2025 22:30 |
End Date |
28/04/2025 ( 6 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreReplacement of 6 nos. existing narrow-poor minor bridge-culvert by suitable waterways structure with provision of temp. di etc. and raising of embankment ... in between km 610.00 to km 626.00 of nh-31 i the dist. of jalpaiguri, job no.566.
Replacement of 6 nos. existing narrow-poor minor bridge-culvert by suitable waterways structure with provision of temp. di etc. and raising of embankment ... in between km 610.00 to km 626.00 of nh-31 i the dist. of jalpaiguri, job no.566.
Read moreDevelopment o-m of dr.syama prasad mookerjee tunnel (chenani nashri tunnel) 2lane new tube and chenani nashri tunnel and udhampur-ramban (km67.000-km89.000 km130.000-151.000) and ramban marog (km151.000-km156.900) on dbfot basis in jk under nh(o)
Development o-m of dr.syama prasad mookerjee tunnel (chenani nashri tunnel) 2lane new tube and chenani nashri tunnel and udhampur-ramban (km67.000-km89.000 km130.000-151.000) and ramban marog (km151.000-km156.900) on dbfot basis in jk under nh(o)
Read moreConstruction and widening of existing narrow culvert on irrigation canal at km 115.030 of nh 327e under nh division purnea in the state of bihar for year 2024-25. (job no- nh -327e/br/2024-25/117
Construction and widening of existing narrow culvert on irrigation canal at km 115.030 of nh 327e under nh division purnea in the state of bihar for year 2024-25. (job no- nh -327e/br/2024-25/117
Read moreConstruction of infrastructure and development work lgsf (light gauge steel framed) building at new itbp camp dobala situated in lapthal valley approx. height 14694 ft and approx. 126 km from 1st bn joshimath, distt chamoli (ukd) connected by metaled
Construction of infrastructure and development work lgsf (light gauge steel framed) building at new itbp camp dobala situated in lapthal valley approx. height 14694 ft and approx. 126 km from 1st bn joshimath, distt chamoli (ukd) connected by metaled
Read more345/erection of street light and cable on old existing pole and fixing new pole invarious ward at nagar parishadbargawan amlai
Erection of street light and cable on old existing pole and fixing new pole invarious ward at nagar parishadbargawan amlai
Read moreSitc of new control cum protection panel for hv side of 66 by 11kv 2mva transformers no. 01 and 02 along with dismantling of existing old panel at matatila hydro power plant distt lalitpur
Sitc of new control cum protection panel for hv side of 66 by 11kv 2mva transformers no. 01 and 02 along with dismantling of existing old panel at matatila hydro power plant distt lalitpur
Read moreDeployment of maintenance teams for maintenance of ofc cable network and upkeep of associated gears/equipment for a period of 2 year and extendable by one year on same terms and conditions in basin bridge arakkonam renigunta section
Deployment of maintenance teams for maintenance of ofc cable network and upkeep of associated gears/equipment for a period of 2 year and extendable by one year on same terms and conditions in basin bridge arakkonam renigunta section
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreof your Industry type