Tender Details

Particulars Details
Title
Bt Renewal Work On Sutarkhedi Santer And Santer Road To Kishanganj Approach Road Total Length 1.90 Km Under Rasalpura Sub Division Mhow
Description
Bt Renewal Work On Sutarkhedi Santer And Santer Road To Kishanganj Approach Road Total Length 1.90 Km Under Rasalpura Sub Division Mhow
Organisation PWD- Roads and Bridges | State Govt. and UT
Tender Id 2025_PWDRB_394322_1
Reference
Number
31/SAC/2024-25/Indore Dated - 09-01-2025(1)
Tender Fee 5428
EMD 50000
Tender Value
Place INDORE
Link https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=464215
Start Date January 10, 2025 15:30
End Date

31/01/2025 ( Expired 158 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)

Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)

Read more
Design and constrn of 02 nos various span major minor pmt bridge on open fdn with ss through type and steel girder type and 01 nos of sub structure for modular bridge incl ssi at km 49.20, km 59.90 and 63.00 incl approach rd on npd road 114 rcc

Design and constrn of 02 nos various span major minor pmt bridge on open fdn with ss through type and steel girder type and 01 nos of sub structure for modular bridge incl ssi at km 49.20, km 59.90 and 63.00 incl approach rd on npd road 114 rcc

Read more
Design and constrn of 70 m major pmt br on open fdn with steel superstructure through type at km 91.42 and sub structure for 39.62 m span modular bridge at km 92.40 incl ssi and proof checking of design and dwg from iit incl approach rd on npd road

Design and constrn of 70 m major pmt br on open fdn with steel superstructure through type at km 91.42 and sub structure for 39.62 m span modular bridge at km 92.40 incl ssi and proof checking of design and dwg from iit incl approach rd on npd road

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Stmc hill cutting across the river at ch 126.100 to ch 126.200 in dimapur kohima road section on nh-29

Short term maintenance contract for hill cutting across the river at ch 126.100 to ch 126.200 in dimapur kohima road section on nh-29 in the state of nagaland in fy 2025-26 percentage rate and work order basis

Read more
Construction of road kibithu kundao from km 0.000 to km 52.000 design length 0.000 to 19.557 kms green field alignment to nhsl specifications under project udayak in anjaw district of arunachal pradesh state on epc mode

Construction of road kibithu kundao from km 0.000 to km 52.000&#x0d design length 0.000 to 19.557 kms green field alignment to nhsl&#x0d specifications under project udayak in anjaw district of arunachal&#x0d pradesh state on epc mode&#x0d

Read more
Consultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh

Consultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise