Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing And Laying Hdpe Rising Main For Treated Effluent From 2 Nos Drain No 8 Charkhi Dadri Providing And Fixing Horiontal Spindle
|
| Description |
Providing And Laying Hdpe Rising Main For Treated Effluent From 2 Nos Drain No 8 Charkhi Dadri Providing And Fixing Horiontal Spindle
|
| Organisation | Haryana Government | State Govt. and UT |
| Tender Id | 2024_HRY_341313_1 |
|
Reference Number |
SE Memo No. 12141 Dated 10/10/2023 |
| Tender Fee | 2180 |
| EMD | 17660 |
| Tender Value | |
| Place | EE Phed Chakrhi Dadri |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=416387 |
| Start Date | January 15, 2024 19:30 |
| End Date |
Expired
22/01/2024
Expired 880 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Operation and maintenance of ci di hdpe upvc ac gi rising main and distribution system for nebadhui duttapukur zone-i water supply scheme under barasat sub division, p.h.e.dte. period from july26 to june27 12 month total length of pip
Read moreProviding and laying pipeline for water supply for 16 no. and 6 no. bhowra under e.j area
Providing and laying pipeline for water supply for 16 no. and 6 no. bhowra under e.j area
Read moreConstruction of boundary wall from main gate to main road along with main gate and construction of entrance arch including and external electrical installations at 27 scg, nsg, regional hub chennai. sh: providing and making ornamental finishes to the columns and beams at nsg main entrance.
Read more1.repairing of otta 2.providing and fixing fencing for cemetry 3.construction drainage pipe line (underground)4.constructing drainage pipe line (underground5.construction of c.c. drain6.providing and fixing paver block at. g.p. gharod ta. khamgaon
1.repairing of otta 2.providing and fixing fencing for cemetry 3.construction drainage pipe line (underground)4.constructing drainage pipe line (underground5.construction of c.c. drain6.providing and fixing paver block at. g.p. gharod ta. khamgaon
Read moreProviding storm water drain and culvert at anna nagar main road (080017r257), anna nagar north road (080017r260) and vinayagar kovil road (080017r264) ward no 17 in palani municipality
Providing storm water drain and culvert at anna nagar main road (080017r257), anna nagar north road (080017r260) and vinayagar kovil road (080017r264) ward no 17 in palani municipality
Read moreConstruction of a cc road and drain in ward no. 03, arya nagar, gosaiganj extending from the west of the main road, passing through the harijan basti, and connecting back to the main road
Construction of a cc road and drain in ward no. 03, arya nagar, gosaiganj extending from the west of the main road, passing through the harijan basti, and connecting back to the main road
Read more05/ee(e)(puducherry)/cpwd/2026-27 - recall 2
Construction of 400 bedded boys hostel building at jipmer campus, puducherry. (civil work): building portion including internal water supply lines, sanitary installation, drainage, demolition of existing quarters and other development works. (electrical and mechanical installation): package c1: providing internal ei, c2: providing fire alarm system, c3: providing firefighting system, c4: providing cctv, c5: providing 3 nos. 13 passenger lift, c6: providing 5000 lpd solar water heater, c7: providing network, (agreement no.32/ee(puducherry)/cpwd/2023-24) sub head: risk and cost under clause 14 for providing 2nos. 13 passenger lift.
Read moreEstimate for laying rcc pip...
Estimate for laying rcc pipeline for connecting village pond rambass and providing irrigation facilities off-taking from km. 12.000/l of rambass disty. and enhancing capacity of pond.
Read moreEstimate for laying rcc pip...
Estimate for laying rcc pipeline for connecting village pond of atali and providing irrigation facilities off-taking from rd km.2.550/l of mohmadpur disty. and enhancing capacity of pond..
Read moreEstimate for laying rcc pip...
Estimate for laying rcc pipeline for connecting village pond of kalwari ( baba samska wala pond) and providing irrigation facilities off taking from rd 8.770/l of mohmadpur disty. and enhancing capacity of pond.
Read moreof your Industry type