Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Procurement Opportunity: Tower Split Air Conditioner 🌡️🏢 The Ministry Of Railways, Central Government, Invites Tenders For The Supply Of Tower Split Air Conditioners For Installation At Jabalpur. 🚂 📅 Submission Deadline: July 11, 2024, 12:30 Pm Interested Bidders Are Requested To Review The Complete Tender Document For Detailed Specifications And Submission Guidelines. Keywords: Tower Split Air Conditioner, Ministry Of Railways, Central Government, Tender, Jabalpur, Hvac Equipment| Particulars | Details |
|---|---|
| Title |
Tower Split Air Conditioner.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106393469 |
|
Reference Number |
94245333A |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Jabalpur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/072024/106393469/viewNitPdf_4626058.pdf |
| Start Date | July 01, 2024 21:41 |
| End Date |
Expired
11/07/2024
Expired 807 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Read moreRevamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreDesign, manufacture, inspection, supply, transportation to site, supervision on erection, testing and commissioning of 1no. reciprocating air compressor with 55kg/cm2 discharge pressure and 7m3/min. inlet flowrate capacity along with suitable motor, control panel, sensors, indicators, electrical cables, plc controls etc at nagarjunasagar main power house
Design, manufacture, inspection, supply, transportation to site, supervision on erection, testing and commissioning of 1no. reciprocating air compressor with 55kg/cm2 discharge pressure and 7m3/min. inlet flowrate capacity along with suitable motor, control panel, sensors, indicators, electrical cables, plc controls etc at nagarjunasagar main power house
Read moreTower air conditioner,casatte air conditioner,split air conditioner,air conditioner copper pipe,ins
Read more
Tower air conditioner,casatte air conditioner,split air conditioner,air conditioner copper pipe,ins
Read more
of your Industry type