Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Rcc Pedastal From P97 To P174 For 800 Mm Dia Ms Pipe. From Chainage 2830 M To 3180 M At Main Pipe Line Lot 2
|
Description |
Construction Of Rcc Pedastal From P97 To P174 For 800 Mm Dia Ms Pipe. From Chainage 2830 M To 3180 M At Main Pipe Line Lot 2
|
Organisation | U P Irrigation Department (Mechanical) | State Govt. and UT |
Tender Id | 2025_UPIDM_1013450_1 |
Reference Number |
17/EEMLCD/2024-25 |
Tender Fee | 854 |
EMD | 66220 |
Tender Value | |
Place | Banda |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1832709 |
Start Date | March 12, 2025 17:30 |
End Date |
18/03/2025 ( Expired 81 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreWidening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreW.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
Read moreConstruction of mor sagar artificial reservoir and feeder from bisalpur to mor sagar artificial reservoir, including all components with its o and m for a period of 20 years on hybrid annuity model (ercp-11-09-tf-5
Construction of mor sagar artificial reservoir and feeder from bisalpur to mor sagar artificial reservoir, including all components with its o and m for a period of 20 years on hybrid annuity model (ercp-11-09-tf-5
Read moreRevised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreConstruction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Read moreSitc of bed cum passenger lift at ipd building_ opd building_ 2 nos mo quarter and 2 nos nurse quarter buildings
Construction of infrastructure up-gradation of kaliyaganj state general hospital from 60 beds to 250 beds at kaliyaganj in the district of uttar dinajpur - sitc of bed cum passenger lift at ipd building, opd building-2nos mo quarter and 2nos quarter
Read moreSpecial repair for con of old vintage ci pipe line to di pipe line and replacement of old unserviceable gi pipe, valve etc at various location of mcmm under ge (east) jabalpur
Special repair for con of old vintage ci pipe line to di pipe line and replacement of old unserviceable gi pipe, valve etc at various location of mcmm under ge (east) jabalpur
Read moreof your Industry type