Tender Details
Particulars | Details |
---|---|
Title |
Deposit Work Laying 300mm Dia Sw Sewer Line And Construction Of Rcc Manhole At Thampuranmukku Near Zamzam Restaurant Sewerage Work
|
Description |
Deposit Work Laying 300mm Dia Sw Sewer Line And Construction Of Rcc Manhole At Thampuranmukku Near Zamzam Restaurant Sewerage Work
|
Organisation | Kerala Water Authority | State Govt. and UT |
Tender Id | 2025_KWA_734603_1 |
Reference Number |
28/2024-25/KWA/PD/TVM |
Tender Fee | 725 |
EMD | 8206 |
Tender Value | |
Place | Karimanal |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1175693 |
Start Date | February 05, 2025 20:30 |
End Date |
14/02/2025 ( Expired 113 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreCurve improvements at km 41.500 on nh-69 black spot id ka 05 37 and construction of rcc culvert at km 35.600 on honnasagar section in the state karnataka on epc mode
Curve improvements at km 41.500 on nh-69 black spot id ka 05 37 and construction of rcc culvert at km 35.600 on honnasagar section in the state karnataka on epc mode
Read moreW.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
Read moreConstruction of b.t. road work at bablu patel to aara mashin and mahamaya mandir to tekram masab ward no. 03, barghat
Construction of b.t. road work at bablu patel to aara mashin and mahamaya mandir to tekram masab ward no. 03, barghat
Read moreConstruction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)
Construction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreEng. pro. const. and comm. epc and performance followed by o and m of stp of 40 mld capacity based on sequential batch reactor sbr technology near chandlai lake for bambala area, sanganer sewerage work under ee phe i jda jaipur
Eng. pro. const. and comm. epc and performance followed by o and m of stp of 40 mld capacity based on sequential batch reactor sbr technology near chandlai lake for bambala area, sanganer sewerage work under ee phe i jda jaipur
Read moreConstruction of sgr hall, fire wall, store room, turfing and security fencing at 33/11 kv substation-civil line, district- prayagraj
Construction of sgr hall, fire wall, store room,turfing and security fencing at 33/11 kv substation-civil line, district- prayagraj
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreof your Industry type