Tender Details
Particulars | Details |
---|---|
Title |
Providing And Fixing Of Wall Panelling And Pvc Flooring In Computer Lab In Department Of Psychology Mdu Rohtak
|
Description |
Providing And Fixing Of Wall Panelling And Pvc Flooring In Computer Lab In Department Of Psychology Mdu Rohtak
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id | 2025_HRY_440396_1 |
Reference Number |
20259C942A4C E303 4443 9525 838A741B7E8B817MDU |
Tender Fee | 1680 |
EMD | 3420 |
Tender Value | |
Place | Rohtak |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=517761 |
Start Date | April 15, 2025 18:30 |
End Date |
29/04/2025 ( Expired 15 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Read moreInternal painting and fixing of vitrified floor tiles in field hostel, regional headquarter, nerts, shillong
Internal painting and fixing of vitrified floor tiles in field hostel, regional headquarter, nerts, shillong
Read moreConstruction of retaining wall and excavation work in the east and west direction of badhiya talab in kamla nagar ward 3. length 67.65 m, width 60 m
Construction of retaining wall and excavation work in the east and west direction of badhiya talab in kamla nagar ward 3. length 67.65 m, width 60 m
Read moreProvn of retaining wall and drain between certain unit locations in the aor of age b/r-ii under ge 864 ews, job no w/evi-06/bb cantt/2024-25
Cwek/token-16/864 ews/2025-26 provn of retaining wall and drain between certain unit locations in the aor of age b/r-ii under ge 864 ews, job no w/evi-06/bb cantt/2024-25
Read moreProviding and fixing cast iron brench of ward no. 31 in moulik nidhi file no. 20/25x13/1
Providing and fixing cast iron brench of ward no. 31 in moulik nidhi file no. 20/25x13/1
Read moreRepair and maintenance of boundary wall from the main gate to market area and different places in dvc colony at tilaiya dam,t.k. division konar
Repair and maintenance of boundary wall from the main gate to market area and different places in dvc colony at tilaiya dam,t.k. division konar
Read moreNfn/civil/666/2025/03 dated 12/05/2025 providing and laying of pavers on truck / tankers moving area in nitric acid plant inside factory area of nfl nangal unit
Nfn/civil/666/2025/03 dated 12/05/2025 providing and laying of pavers on truck / tankers moving area in nitric acid plant inside factory area of nfl nangal unit
Read moreProviding solar highway lighting at 104 nos of locations of nh-16, nh-216 and nh-216a in the state of ap as a part of rectification of morth identified blackspots and accident spots
Providing solar highway lighting at 104 nos of locations of nh-16, nh-216 and nh-216a in the state of ap as a part of rectification of morth identified blackspots and accident spots
Read moreConstruction of new operational boundary wall in place of old, damaged load bearing boundary wall and raising of boundary wall as per bcas standard including provision of precast slab below ground level as required at mbb airport, agartala
Construction of new operational boundary wall in place of old, damaged load bearing boundary wall and raising of boundary wall as per bcas standard including provision of precast slab below ground level as required at mbb airport, agartala
Read moreProviding and laying and compaction of wbm, sand blanketing, ilcb (m50 grade) and casting of edge block in between km 0.910 to km 12.00 on nelya- dhaula road for surfacing works under 42 brtf of project vartak in arunachal pradesh
Providing and laying and compaction of wbm, sand blanketing, ilcb (m50 grade) and casting of edge block in between km 0.910 to km 12.00 on nelya- dhaula road for surfacing works under 42 brtf of project vartak in arunachal pradesh
Read moreof your Industry type