Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ttps Operation Circle Cad Complete Overhauling And Replacement Of Heat Exchanger Booster Pump Motor Of 150 Kw Crompton Greaves Make Motor 2 B M9 Sl .No Bdy0267 At Hebp Area
|
| Description |
Ttps Operation Circle Cad Complete Overhauling And Replacement Of Heat Exchanger Booster Pump Motor Of 150 Kw Crompton Greaves Make Motor 2 B M9 Sl .No Bdy0267 At Hebp Area
|
| Organisation | Government of Tamil Nadu |
| Tender Id | 2023_EB_386301_1 |
|
Reference Number |
CE/SE/O/TTPS/Spec.No.182/23-24 |
| Tender Fee | 0 |
| EMD | 300 |
| Tender Value | - |
| Place | O/o SE/O/TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in |
| Start Date | November 06, 2023 23:30 |
| End Date |
Expired
20/11/2023
Expired 1063 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing and rewinding of 200kw 3.3kv squirrel cage induction motor cc no 406 make crompton greaves at jhanjra area workshop
Repairing and rewinding of 200kw 3.3kv squirrel cage induction motor cc no 406 make crompton greaves at jhanjra area workshop
Read moreTtps operation circle cad unit iv overhauling of 110 kw acwp motor 1 no and 75 kw swbp motor 3 nos. at acws
Ttps operation circle cad unit iv overhauling of 110 kw acwp motor 1 no and 75 kw swbp motor 3 nos. at acws
Read moreTtps operation circle cad unit v overhauling of 110 kw acwp motor 1 no and 75 kw swbp motor 3 nos. at acws
Ttps operation circle cad unit v overhauling of 110 kw acwp motor 1 no and 75 kw swbp motor 3 nos. at acws
Read moreRepairing of 200kw 3300 volt 1490 rpm crompton greaves make sq cage type motor sl no 89 at mic jhanjra project collie
Repairing of 200kw 3300 volt 1490 rpm crompton greaves make sq cage type motor sl no 89 at mic jhanjra project collie
Read moreUrgent overhauling of 415v 110kw crompton greaves make motor no2 of 5 7 mld vt pump at dattawadi sankhalim jackwell in poriem constituency
Urgent overhauling of 415v 110kw crompton greaves make motor no2 of 5 7 mld vt pump at dattawadi sankhalim jackwell in poriem constituency
Read moreTtps operation circle cad complete rewinding of ngef make 415v, 30kw, 1470 rpm, dm pump motor m4 sl.no.17262301 at clwph
Ttps operation circle cad complete rewinding of ngef make 415v, 30kw, 1470 rpm, dm pump motor m4 sl.no.17262301 at clwph
Read moreTtps operation circle cad unit v cw pump 6.6kv, 570 kw jyoti make cw pump ht motors location 5a to 5d cleaning of side air cooler set, top fan, top fan cover, motor cooler chamber and renewal of grease and painting works during the forthcoming overh
Ttps operation circle cad unit v cw pump 6.6kv, 570 kw jyoti make cw pump ht motors location 5a to 5d cleaning of side air cooler set, top fan, top fan cover, motor cooler chamber and renewal of grease and painting works during the forthcoming overh
Read moreTtps operation circle cad unit iv cw pump 6.6kv, 570 kw jyoti make cw pump ht motors location 4a to 4d cleaning of side air cooler set, top fan, top fan cover, motor cooler chamber and renewal of grease and painting works during the forthcoming over
Ttps operation circle cad unit iv cw pump 6.6kv, 570 kw jyoti make cw pump ht motors location 4a to 4d cleaning of side air cooler set, top fan, top fan cover, motor cooler chamber and renewal of grease and painting works during the forthcoming over
Read moreTtps operation circle cad complete overhauling and replacement of heat exchanger booster pump motors of 160 kw ngef make motor 1a m10 150kw crompton greaves make motor 1b m4 at hebp area
Ttps operation circle cad complete overhauling and replacement of heat exchanger booster pump motors of 160 kw ngef make motor 1a m10 150kw crompton greaves make motor 1b m4 at hebp area
Read moreTtps operation circle cad complete overhauling and replacement of 150kw crompton greaves make heat exchanger booster pump motors during emergency breakdown of any one of the motors in the hebp area
Ttps operation circle cad complete overhauling and replacement of 150kw crompton greaves make heat exchanger booster pump motors during emergency breakdown of any one of the motors in the hebp area
Read moreof your Industry type