Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Procurement Opportunity: Manufacturing Of Diesel Hydraulic Locomotive 🚂 The Ministry Of Railways, Specifically The Central Govt. Ministry/Department, Is Seeking Bids For The Manufacturing Of Diesel Hydraulic Locomotives For The Darjeeling Himalayan Railway At The C&W Workshop, N.F. Railway, New Bongaigaon. 📅 Bid Submission Deadline: May 07, 2024, 3:00 Pm A Tender Fee Of Inr 100,000 And An Earnest Money Deposit (Emd) Of Inr 7,45,600 Are Applicable. Interested Bidders Must Review The Complete Tender Document For Detailed Specifications And Submission Guidelines. Keywords: Manufacturing, Diesel Hydraulic Locomotive, Darjeeling Himalayan Railway, C&W Workshop, N.F. Railway, New Bongaigaon, Ministry Of Railways, Government Tender, Emd, Tender Fee| Particulars | Details |
|---|---|
| Title |
Manufacturing Of Diesel Hydraulic Locomotive For Darjeeling Himalayan
Railway At C&Amp W Workshop, N.F. Railway, New Bongaigaon
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 74306358 |
|
Reference Number |
M-249-RSP-2023-24-DRG-07B |
| Tender Fee | 10000 |
| EMD | 7.46 Lakh |
| Tender Value | |
| Place | Guwahati |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/052024/74306358/viewNitPdf_4520108.pdf |
| Start Date | March 22, 2024 23:52 |
| End Date |
Expired
07/05/2024
Expired 761 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Manufacturing, supply and laying of rcc cable trough for orr and airport line (new line) of phase-2a and phase-2b.
Manufacturing, supply and laying of rcc cable trough for orr and airport line (new line) of phase-2a and phase-2b.
Read moreConstruction of steel framing building g plus 2 for advance manufacturing robotics and automation and advanced manufacturing industry 4.0 and iiot labs at nsut campus, sector-3, dwarka, new delhi during 2026-27 civil and electrical work
Construction of steel framing building g plus 2 for advance manufacturing robotics and automation and advanced manufacturing industry 4.0 and iiot labs at nsut campus, sector-3, dwarka, new delhi during 2026-27 civil and electrical work
Read moreDeposit-amc of substation and diesel generator sets 2026-2027-fully comprehensive annual maintenance contract for substation and diesel generator sets
Deposit-amc of substation and diesel generator sets 2026-2027-fully comprehensive annual maintenance contract for substation and diesel generator sets at govt medical college thrissur for the period from 01-04-2026 to 31-03-2027-general electrical
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreProviding three phase power supply for hydraulic bollard, rfid reader, online ups system to be installed at gate no. 2,3,4 and 5 and miscellaneous electrical works at new delhi district court complex at rouse avenue ddu marg, new delhi.
Providing three phase power supply for hydraulic bollard, rfid reader, online ups system to be installed at gate no. 2,3,4 and 5 and miscellaneous electrical works at new delhi district court complex at rouse avenue ddu marg, new delhi.
Read moreThis work for lining of w/c...
Estimate for lining of w/c at outlet rd 21020/r lohari minor (extension) slice
Read moreDevelopment of internal infrastructure for integrated manufacturing and logistics cluster at budaun with defect liability period and operation and maintenance for concurrent period of five years on epc mode
Development of internal infrastructure for integrated manufacturing and logistics cluster at budaun with defect liability period and operation and maintenance for concurrent period of five years on epc mode
Read moreLaying of tower foundations erection of towers and stringing and sagging of conductor with earthwire for undergrounding of 66 kv oh line from 220 kv ss lalton kalan to 66 kv gill road ss at railway crossing on request of railway department
Laying of tower foundations erection of towers and stringing and sagging of conductor with earthwire for undergrounding of 66 kv oh line from 220 kv ss lalton kalan to 66 kv gill road ss at railway crossing on request of railway department
Read moreContract for construction of new stores for capacity enhancement of biomass briquitte storage at rcf thal
Contract for construction of new stores for capacity enhancement of biomass briquitte storage at rcf thal
Read moreDay to day operation and comprehensive maintenance of all sel generator sets at the bu campuses excluding supply of diesel for the period of one year
Day to day operation and comprehensive maintenance of all sel generator sets at the bu campuses excluding supply of diesel for the period of one year
Read moreof your Industry type