Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Under A.R. Fy 2025 26, Renewal Work By Sdbc (25 Mm) By Hot Mix Plant In Rudraprayag Pokhari Gopeshwar Motor Road In Km 47,48,49,50,54(500)
|
Description |
Under A.R. Fy 2025 26, Renewal Work By Sdbc (25 Mm) By Hot Mix Plant In Rudraprayag Pokhari &Amp#X0d
Gopeshwar Motor Road In Km 47,48,49,50,54(500)
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2025_pwd_82992_1 |
Reference Number |
993/3AC Date 22-04-2025 |
Tender Fee | 4720 |
EMD | 1.55 Lakh |
Tender Value | |
Place | Pokhari |
Link | https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=98849 |
Start Date | April 24, 2025 20:30 |
End Date |
30/04/2025 ( Expired 55 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Read moreMaintenance work from km 0/000 to km 57/25 (length 57.25 km) sendhwa to khetia section of nh-752g and from km 34/56 to km 36/00 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh
Maintenance work from km 0/000 to km 57/25 (length 57.25 km) sendhwa to khetia section of nh-752g and from km 34/56 to km 36/00 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh
Read moreWbpwd/rds/nit-04 (sl. no.05)/25-26/ee/mhd
Emergent repairing and maintenance work of sabong - mohar road from 8.00 kmp to 12.00 kmp in stretches under midnapore highway division in the district of paschim medinipur. (ch. to non-plan/ rain damage restoration)
Read moreImprovement of brick soled road to all weather road during the year 2025 26 sh construction of road from the ho dulal roy to nirmal ch roy by providing gsb, wbm ii, paver block, r wall etc. under central v sub division. l 0.130 km
Improvement of brick soled road to all weather road during the year 2025 26 sh construction of road from the ho dulal roy to nirmal ch roy by providing gsb, wbm ii, paver block, r wall etc. under central v sub division. l 0.130 km
Read moreEmergent repairing work of bblr (sh-11a) from 58.770 km to 58.99 km by providing gsb-iii, wmm layer, bm, p.c. s.c. and side shoulders by jhama moorum consolidation etc. under jangipur sub-division under berhampore division no.-i, p.w.d during 25-26
Emergent repairing work of bblr (sh-11a) from 58.770 km to 58.99 km by providing gsb-iii, wmm layer, bm, p.c. s.c. and side shoulders by jhama moorum consolidation etc. under jangipur sub-division under berhampore division no.-i, p.w.d during 2025-
Read moreImprovement and bituminous work on tugdunda-bhaiswara motor road (km 0.000 to 5.000) in pauri constituency of pauri gharwal district under state sector
Improvement and bituminous work on tugdunda-bhaiswara motor road (km 0.000 to 5.000) in pauri constituency of pauri gharwal district under state sector
Read moreAAAAAAAAAA
Login to viewMoei fans, rmo booster p/set in the r/o hmps bungalows under ferozshah road sub division-1, ded-201, dg. 2025-26. (sh: replacement of bollard, led fixture ei work at ab-3 purana quila road)
Read moreAAAAAAAAAA
Login to viewJamuria-chakdola road from 0.850 km to 1.600 km, 5.750 km to 6.250 km patch repairing work in stretches in the district of paschim bardhaman under asansol division, pwd in the year of 2025-26.
Read moreConstruction of road from main road mandi phagla buffliaz km 7th to peer fazal shah ziyarat via mohalla kumarah surankote part 1st by way of earth work in cutting,cross drainage,walling, providing and laying of 150 mm thick wbm grade-ii,75mm thick w
Construction of road from main road mandi phagla buffliaz km 7th to peer fazal shah ziyarat via mohalla kumarah surankote part 1st by way of earth work in cutting,cross drainage,walling, providing and laying of 150 mm thick wbm grade-ii,75mm thick w
Read moreStrengthening work by dbm bc in marchula sarikhet bajro pokhda stpuli pauri motor road sh 32 in km 41 to 75.500 in almora district under central road and infrastructure fund crif
Strengthening work by dbm bc in marchula sarikhet bajro pokhda stpuli pauri motor road sh 32 in km 41 to 75.500 in almora district under central road and infrastructure fund crif
Read moreof your Industry type