Tender Details

Particulars Details
Title
Under A.R. Fy 2025 26, Renewal Work By Sdbc (25 Mm) By Hot Mix Plant In Rudraprayag Pokhari Gopeshwar Motor Road In Km 47,48,49,50,54(500)
Description
Under A.R. Fy 2025 26, Renewal Work By Sdbc (25 Mm) By Hot Mix Plant In Rudraprayag Pokhari &Amp#X0d Gopeshwar Motor Road In Km 47,48,49,50,54(500)
Organisation PWD | State Govt. and UT
Tender Id 2025_pwd_82992_1
Reference
Number
993/3AC Date 22-04-2025
Tender Fee 4720
EMD 1.55 Lakh
Tender Value
Place Pokhari
Link https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=98849
Start Date April 24, 2025 20:30
End Date

30/04/2025 ( Expired 55 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode

Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode

Read more
Maintenance work from km 0/000 to km 57/25 (length 57.25 km) sendhwa to khetia section of nh-752g and from km 34/56 to km 36/00 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh

Maintenance work from km 0/000 to km 57/25 (length 57.25 km) sendhwa to khetia section of nh-752g and from km 34/56 to km 36/00 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh

Read more
Wbpwd/rds/nit-04 (sl. no.05)/25-26/ee/mhd

Emergent repairing and maintenance work of sabong - mohar road from 8.00 kmp to 12.00 kmp in stretches under midnapore highway division in the district of paschim medinipur. (ch. to non-plan/ rain damage restoration)

Read more
Improvement of brick soled road to all weather road during the year 2025 26 sh construction of road from the ho dulal roy to nirmal ch roy by providing gsb, wbm ii, paver block, r wall etc. under central v sub division. l 0.130 km

Improvement of brick soled road to all weather road during the year 2025 26 sh construction of road from the ho dulal roy to nirmal ch roy by providing gsb, wbm ii, paver block, r wall etc. under central v sub division. l 0.130 km

Read more
Emergent repairing work of bblr (sh-11a) from 58.770 km to 58.99 km by providing gsb-iii, wmm layer, bm, p.c. s.c. and side shoulders by jhama moorum consolidation etc. under jangipur sub-division under berhampore division no.-i, p.w.d during 25-26

Emergent repairing work of bblr (sh-11a) from 58.770 km to 58.99 km by providing gsb-iii, wmm layer, bm, p.c. s.c. and side shoulders by jhama moorum consolidation etc. under jangipur sub-division under berhampore division no.-i, p.w.d during 2025-

Read more
Improvement and bituminous work on tugdunda-bhaiswara motor road (km 0.000 to 5.000) in pauri constituency of pauri gharwal district under state sector

Improvement and bituminous work on tugdunda-bhaiswara motor road (km 0.000 to 5.000) in pauri constituency of pauri gharwal district under state sector

Read more

Moei fans, rmo booster p/set in the r/o hmps bungalows under ferozshah road sub division-1, ded-201, dg. 2025-26. (sh: replacement of bollard, led fixture ei work at ab-3 purana quila road)

Read more

Jamuria-chakdola road from 0.850 km to 1.600 km, 5.750 km to 6.250 km patch repairing work in stretches in the district of paschim bardhaman under asansol division, pwd in the year of 2025-26.

Read more
Construction of road from main road mandi phagla buffliaz km 7th to peer fazal shah ziyarat via mohalla kumarah surankote part 1st by way of earth work in cutting,cross drainage,walling, providing and laying of 150 mm thick wbm grade-ii,75mm thick w

Construction of road from main road mandi phagla buffliaz km 7th to peer fazal shah ziyarat via mohalla kumarah surankote part 1st by way of earth work in cutting,cross drainage,walling, providing and laying of 150 mm thick wbm grade-ii,75mm thick w

Read more
Strengthening work by dbm bc in marchula sarikhet bajro pokhda stpuli pauri motor road sh 32 in km 41 to 75.500 in almora district under central road and infrastructure fund crif

Strengthening work by dbm bc in marchula sarikhet bajro pokhda stpuli pauri motor road sh 32 in km 41 to 75.500 in almora district under central road and infrastructure fund crif

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise