Tender Details

About Tender

🛣️ Invitation For Bids: Strengthening Work On Various Roads 🛣️ The Public Works Department (Roads And Bridges), State Government & Ut, Invites Bids For The Strengthening Work On Various Roads Under Sub Division Gohad, Including: 1. Gormi To Kripe Ka Pura Approach Road 🗺️ 2. Gurikha To Nogaon Approach Road 🗺️ 3. Morkhi To Baijla Road 🗺️ 4. Jagnath Pura Approach Road 🗺️ Total Length Of The Roads To Be Strengthened: 6.20 Km Bid Submission Deadline: 20/04/2024, 5:30 Pm ⏳ Tender Fee: Inr 13,724 Earnest Money Deposit (Emd): Inr 10,37,200 Eligible Bidders Are Requested To Submit Detailed Bids, Including Technical And Financial Proposals, In Accordance With The Specifications And Guidelines Provided In The Tender Document. Keywords: Strengthening Work, Road Construction, Pwd, Government Tender, Roads And Bridges, Infrastructure Development, Bid Submission, Tender Document, Earnest Money Deposit
Particulars Details
Title
Strengthing Work On Various Road Under Sub Dn. Gohad (1) Gormi To Kripe Ka Pura Approach Road. (2) Gurikha To Nogaon Approach Road. (3) Morkhi To Baijla Road. (4) Jagnath Pura Approach Road. Total Length 6.20 Km
Description
Strengthing Work On Various Road Under Sub Dn. Gohad&Amp#X0d (1) Gormi To Kripe Ka Pura Approach Road.&Amp#X0d (2) Gurikha To Nogaon Approach Road.&Amp#X0d (3) Morkhi To Baijla Road.&Amp#X0d (4) Jagnath Pura Approach Road.&Amp#X0d Total Length 6.20 Km
Organisation PWD- Roads and Bridges | State Govt. and UT
Tender Id 2024_PWDRB_341769_1
Reference
Number
16(6)/SAC/2023-24/BHIND
Tender Fee 13724
EMD 1.04 Lakh
Tender Value
Place OFFICE OF THE EXECUTIVE ENGINEER PWD DIV. BHIND
Link https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=401703
Start Date March 06, 2024 23:00
End Date

20/04/2024 ( Expired 441 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode

Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Balance periodic renewal work in km. 14.200 to 25.530 and 31.540 to 55.700 total length 35.480 km. on n.h. 30 (old n.h. 221) jagdalpur-sukma road on epc mode in the state of chhattisgarh on epc mode.

Balance periodic renewal work in km. 14.200 to 25.530 and 31.540 to 55.700 total length 35.480 km. on n.h. 30 (old n.h. 221) jagdalpur-sukma road on epc mode in the state of chhattisgarh on epc mode.

Read more
Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a

Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a

Read more
Raising strengthening and construction of flexible pavement road on esml total length 31.985 km with restoration of 7 nos. stud and construction of 13 nos. new studs from km 14.00 to km 26.275 of esml under bwsimp.

Raising, strengthening and construction of flexible pavement road on esml total length 31.985 km with restoration of 7 nos. stud and construction of 13 nos. new studs from km 14.00 to km 26.275 of esml under bwsimp.

Read more
Bt renewal work on satna semaria road total length 22.20 km. under sub division satna

Bt renewal work on satna semaria road total length 22.20 km. under sub division satna

Read more
Strenthing work on manasa morvan road in km 16/2-17/2-,20/10-22/2 length 2.195 km dn. neemuch

Strenthing work on manasa morvan&amp#x0d road in km 16/2-17/2-,20/10-22/2 length&amp#x0d 2.195 km dn. neemuch&amp#x0d &amp#x0d

Read more
Wpt. including necessary repairs water supply drainage installation and other allied civil work in resi. buildings of kotra sultanabad section no.1 and 2 under pwd. city sub dn. no.3 bhopal.

Wpt. including necessary repairs water supply drainage installation and other allied civil work in resi. buildings of kotra sultanabad section no.1 and 2 under pwd. city sub dn. no.3 bhopal.

Read more
Mow work of residentail bunglow no. en-2/12, en-1/10, d-4/17 under survey sub dn. bhopal

Mow work of residentail bunglow no. en-2/12, en-1/10, d-4/17 under survey sub dn. bhopal

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise