Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Horticulture Works At G.M. Bunglow Of Giridih Project Under Giridih Area (For A Period Of 12 Months)
|
| Description |
Horticulture Works At G.M. Bunglow Of Giridih Project Under Giridih Area (For A Period Of 12 Months)
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_CCL_291092_1 |
|
Reference Number |
GM(G)/SO(C)/E-tender/23-24/52 dt.13.10.23 |
| Tender Fee | - |
| EMD | 5800 |
| Tender Value | - |
| Place | office of General Manager, Giridih Area, Giridih |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | October 14, 2023 15:30 |
| End Date |
Expired
24/10/2023
Expired 1068 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hiring of 12nos of diesel operated generator sets 7.5kva,230v with mobile lighting towers for a period of 36 months for use at kocp,yellandu area.
Hiring of 12nos of diesel operated generator sets 7.5kva,230v with mobile lighting towers for a period of 36 months for use at kocp,yellandu area.
Read moreProviding 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Providing 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreHiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Read moreHorticulture works at g.m. bunglow of giridih project under giridih area (for a period of 12 month)
Horticulture works at g.m. bunglow of giridih project under giridih area (for a period of 12 month)
Read moreMaintenance of railway track of c.p.siding of giridih project, giridih area ( for a period of 12 months)
Maintenance of railway track of c.p.siding of giridih project, giridih area ( for a period of 12 months)
Read moreRepairing of gm bunglow of giridih project, giridih area
Repairing of gm bunglow of giridih project, giridih area
Read moreRoof treatment of g.m. office building of giridih project under giridih area
Roof treatment of g.m. office building of giridih project under giridih area
Read moreFilling of illegal mines/khanta/rat holes in around acquired area of giridih project under giridih area. (for a period of 12 months ).
Filling of illegal mines/khanta/rat holes in around acquired area of giridih project under giridih area. (for a period of 12 months ).
Read moreFilling of illegal mines/khanta/rat holes in around acquired area of giridih project under giridih area. (for a period of 12 months)
Filling of illegal mines/khanta/rat holes in around acquired area of giridih project under giridih area. (for a period of 12 months)
Read moreof your Industry type