Tender Details

About Tender

🏭 Invitation For Pmc Work Bid Unity Mall Construction 🏗️ The Planning Department Of Uttar Pradesh, On Behalf Of The State Government And Union Territories, Invites Bids For Project Management Consultancy (Pmc) Services For The Construction Of Unity Mall At Ganga Nagar Colony, Varanasi, Uttar Pradesh, India, Under The Engineering, Procurement, And Construction (Epc) Mode. 📅 Bid Submission Deadline: April 05, 2024, 3:00 Pm Tender Fee: Inr 6254 Earnest Money Deposit (Emd): Inr 240,000 Interested Bidders Must Possess The Requisite Qualifications And Experience In Pmc Work For Construction Projects. Detailed Proposals, Including Technical Capabilities, Financial Bids, And Project Execution Plans, Are To Be Submitted By The Deadline. Keywords: Pmc Work, Construction, Unity Mall, Ganga Nagar Colony, Varanasi, Uttar Pradesh, Epc Mode, Government Tender, Bid Submission
Particulars Details
Title
Pmc Work For Construction Of Unity Mall At Ganga Nagar Colony Varanasi Up India On Epc Mode
Description
Pmc Work For Construction Of Unity Mall At Ganga Nagar Colony Varanasi Up India On Epc Mode
Organisation Planning Department UP | State Govt. and UT
Tender Id 2024_DPUP_914476_1
Reference
Number
1670/General/Technical Cell/2024 dated 08.03.2024
Tender Fee 6254
EMD 2.4 Lakh
Tender Value
Place Varanasi
Link
View Original Tender Notice

https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1580262

Start Date March 20, 2024 17:00
End Date
Expired 05/04/2024

Expired 804 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Design engineering and procurement for construction of residential and non residential buildings of 3rd battalion of up special security force at district prayagraj uttar pradesh india on epc mode

Design engineering and procurement for construction of residential and non residential buildings of 3rd battalion of up special security force at district prayagraj uttar pradesh india on epc mode

Read more
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode

Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode

Read more
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Read more
Appointment of project management consultant for construction of academic blocks for delhi public school and cisf barracks and other associated infrastructure inside the premises of nalco township angul on deposit work basis cum epc mode

Appointment of project management consultant for construction of academic blocks for delhi public school and cisf barracks and other associated infrastructure inside the premises of nalco township angul on deposit work basis cum epc mode

Read more
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.

Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.

Read more
Reconstruction and repair of major bridge on dhadhar river at km. 180/000 to 180/400 on nh-64 in bharuch district in the state of gujarat on epc mode

Reconstruction and repair of major bridge on dhadhar river at km.&#x0d 180/000 to 180/400 on nh-64 in bharuch district in the state of&#x0d gujarat on epc mode

Read more
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor

Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Read more
Construction of culvert on brahmpuri nala at amer road and retaining wall at santosh nagar, hawa mahal amer zone, nagar nigam, jaipur

Construction of culvert on brahmpuri nala at amer road and retaining wall at santosh nagar, hawa mahal amer zone, nagar nigam, jaipur

Read more
Construction of drain work at rajiv nagar masjid gali w-18

Construction of drain work at rajiv nagar&amp#x0d masjid gali w-18

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise