Tender Details

About Tender

🏭 Invitation For Pmc Work Bid Unity Mall Construction 🏗️ The Planning Department Of Uttar Pradesh, On Behalf Of The State Government And Union Territories, Invites Bids For Project Management Consultancy (Pmc) Services For The Construction Of Unity Mall At Ganga Nagar Colony, Varanasi, Uttar Pradesh, India, Under The Engineering, Procurement, And Construction (Epc) Mode. 📅 Bid Submission Deadline: April 05, 2024, 3:00 Pm Tender Fee: Inr 6254 Earnest Money Deposit (Emd): Inr 240,000 Interested Bidders Must Possess The Requisite Qualifications And Experience In Pmc Work For Construction Projects. Detailed Proposals, Including Technical Capabilities, Financial Bids, And Project Execution Plans, Are To Be Submitted By The Deadline. Keywords: Pmc Work, Construction, Unity Mall, Ganga Nagar Colony, Varanasi, Uttar Pradesh, Epc Mode, Government Tender, Bid Submission
Particulars Details
Title
Pmc Work For Construction Of Unity Mall At Ganga Nagar Colony Varanasi Up India On Epc Mode
Description
Pmc Work For Construction Of Unity Mall At Ganga Nagar Colony Varanasi Up India On Epc Mode
Organisation Planning Department UP | State Govt. and UT
Tender Id 2024_DPUP_914476_1
Reference
Number
1670/General/Technical Cell/2024 dated 08.03.2024
Tender Fee 6254
EMD 2.4 Lakh
Tender Value
Place Varanasi
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1580262
Start Date March 20, 2024 17:00
End Date

05/04/2024 ( Expired 415 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Selection of epc contractor for integrated manufacturing cluster imc palakkad

Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.

Read more
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis

Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis

Read more
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode

Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode

Read more
Construction of 4 lane flyover at tehna junction on harike-faridkot-bathinda section of nh-54 at km. 225.272 in the state of punjab on epc mode

Construction of 4 lane flyover at tehna junction on harike-faridkot-bathinda section of nh-54 at km. 225.272 in the state of punjab on epc mode

Read more
Construction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode

Construction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode

Read more
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.

Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.

Read more
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring

Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring

Read more
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Read more
Request for proposal (rfp) for selection of agency for installation of de-sliming system at hus (mk unit) on engineering procurement construction (epc) basis

Request for proposal (rfp) for selection of agency for installation of de-sliming system at hus (mk unit) on engineering procurement construction (epc) basis

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise