Tender Details
About Tender
🏭 Invitation For Pmc Work Bid Unity Mall Construction 🏗️ The Planning Department Of Uttar Pradesh, On Behalf Of The State Government And Union Territories, Invites Bids For Project Management Consultancy (Pmc) Services For The Construction Of Unity Mall At Ganga Nagar Colony, Varanasi, Uttar Pradesh, India, Under The Engineering, Procurement, And Construction (Epc) Mode. 📅 Bid Submission Deadline: April 05, 2024, 3:00 Pm Tender Fee: Inr 6254 Earnest Money Deposit (Emd): Inr 240,000 Interested Bidders Must Possess The Requisite Qualifications And Experience In Pmc Work For Construction Projects. Detailed Proposals, Including Technical Capabilities, Financial Bids, And Project Execution Plans, Are To Be Submitted By The Deadline. Keywords: Pmc Work, Construction, Unity Mall, Ganga Nagar Colony, Varanasi, Uttar Pradesh, Epc Mode, Government Tender, Bid SubmissionParticulars | Details |
---|---|
Title |
Pmc Work For Construction Of Unity Mall At Ganga Nagar Colony Varanasi Up India On Epc Mode
|
Description |
Pmc Work For Construction Of Unity Mall At Ganga Nagar Colony Varanasi Up India On Epc Mode
|
Organisation | Planning Department UP | State Govt. and UT |
Tender Id | 2024_DPUP_914476_1 |
Reference Number |
1670/General/Technical Cell/2024 dated 08.03.2024 |
Tender Fee | 6254 |
EMD | 2.4 Lakh |
Tender Value | |
Place | Varanasi |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1580262 |
Start Date | March 20, 2024 17:00 |
End Date |
05/04/2024 ( Expired 415 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreSelection of epc contractor for integrated manufacturing cluster imc palakkad
Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.
Read moreEngineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Read moreConstruction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreConstruction of 4 lane flyover at tehna junction on harike-faridkot-bathinda section of nh-54 at km. 225.272 in the state of punjab on epc mode
Construction of 4 lane flyover at tehna junction on harike-faridkot-bathinda section of nh-54 at km. 225.272 in the state of punjab on epc mode
Read moreConstruction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode
Construction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreRequest for proposal (rfp) for selection of agency for installation of de-sliming system at hus (mk unit) on engineering procurement construction (epc) basis
Request for proposal (rfp) for selection of agency for installation of de-sliming system at hus (mk unit) on engineering procurement construction (epc) basis
Read moreof your Industry type