Tender Details

Particulars Details
Title
Structural Repairs Of Switchyard Cable Trench Using Precast Retaining Walls And Allied Structures At Taps 1and2, Plant Site.
Description
Structural Repairs Of Switchyard Cable Trench Using Precast Retaining Walls And Allied Structures At Taps 1and2, Plant Site.
Organisation Nuclear Power Corporation Of India Limited | Public Sector Undertakings
Tender Id 2025_NPCIL_228164_1
Reference
Number
TMS / CMM-WORKS / CIVIL-1and2 / 2025 / 2550
Tender Fee 0
EMD 1.41 Lakh
Tender Value -
Place Works
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=256333

Start Date March 11, 2025 15:30
End Date
Expired 21/03/2025

Expired 572 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of stone massonry water recharging harvesting crete wire structures retaining walls and crate silt at village haripur manguwal diwari bharatgarh ropar

Construction of stone massonry water recharging harvesting crete wire structures retaining walls and crate silt at village haripur manguwal diwari bharatgarh ropar

Read more
Supplying and erection of precast earth retaining walls and backfilling of earth for engineering halls canteen at sea side, north site, barc, trombay, mumbai

Supplying and erection of precast earth retaining walls and backfilling of earth for engineering halls canteen at sea side, north site, barc, trombay, mumbai

Read more
Improvement works to the damaged cable trench brick walls and replacing the damaged precast cover slabs with new ones at 110/11 kv yard in the sattur ss premises.

Improvement works to the damaged cable trench brick walls and replacing the damaged precast cover slabs with new ones at 110/11 kv yard in the sattur ss premises.

Read more
Badhal khul restoration and structural rehabilitation of l khul by construction of rcc covered channel section from rd 25 to 30 m providing cement concrete retaining walls and or parapet walls 136 from rd 55 to 150 m rd 160 to 210 m and rd 250 to 280

Badhal khul restoration and structural rehabilitation of l khul by construction of rcc covered channel section from rd 25 to 30 m providing cement concrete retaining walls and or parapet walls 136 from rd 55 to 150 m rd 160 to 210 m and rd 250 to 280

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Miscellaneous repairs and maintenance to civil structures at taps 1and2, tms site.

Miscellaneous repairs and maintenance to civil structures at taps 1and2, tms site.

Read more
Waterproofing of prefabricated roof using reinforced thermoplastic polyolefin membrane at reactor building and turbine building of taps, 1and2 plant site.

Waterproofing of prefabricated roof using reinforced thermoplastic polyolefin membrane at reactor building and turbine building of taps, 1and2 plant site.

Read more
Renovation of standard panel room (spr), damaged drains & grouting of cable trench walls in the switchyard at bhiwani substation

Renovation of standard panel room (spr), damaged drains & grouting of cable trench walls in the switchyard at bhiwani substation

Read more
Repairs to structural determination leakage/ seepage and structural strengthning of water retaining structures and other rcc structures in army area mount abu under age (i) udaipur

Repairs to structural determination leakage/ seepage and structural strengthning of water retaining structures and other rcc structures in army area mount abu under age (i) udaipur

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise