Tender Details
About Tender
🏭 Procurement Opportunity: Waste Heat Boiler Components 🏭 Indian Oil, A Central Government Ministry/Department, Is Seeking Bids For The Procurement Of Critical Components For The Waste Heat Boiler 089 Whb 001 Installed In The Tgtu Unit At The Iocl Paradip Refinery. 📅 Bid Submission Deadline: April 22, 2024, 3:00 Pm The Scope Includes The Supply Of Superheater, Screen 1, Screen 2 Assemblies, And Left Hand Side (Lhs) And Right Hand Side (Rhs) Water Wall Panels. Interested Bidders Should Submit Detailed Proposals, Including Technical Specifications, Pricing, And Delivery Schedules, In Accordance With The Project Requirements. Keywords: Procurement, Waste Heat Boiler, Superheater, Screens, Water Wall Panels, Iocl Paradip Refinery, Indian Oil, Government TenderParticulars | Details |
---|---|
Title |
Procurement Of Superheater, Screen 1, Screen 2 Assemblies, Lhs And Rhs Water Wall Panels Waste Heat Boiler 089 Whb 001 Installed In Tgtu Unit At Iocl Paradip Refinery
|
Description |
Procurement Of Superheater, Screen 1, Screen 2 Assemblies, Lhs And Rhs Water Wall Panels Waste Heat Boiler 089 Whb 001 Installed In Tgtu Unit At Iocl Paradip Refinery
|
Organisation | IndianOil | Central Govt. Ministry/Department |
Tender Id | 2024_PDR_176715_1 |
Reference Number |
9070M24F28 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | IOCL Paradip Refinery Jhimani Kujang Jagatsinghpur |
Link | https://iocletenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=186865 |
Start Date | April 15, 2024 22:30 |
End Date |
22/04/2024 ( Expired 398 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of spares for m/s dresser rand make steam turbines installed in cpp unit at iocl paradip refinery
Procurement of spares for m/s dresser rand make steam turbines installed in cpp unit at iocl paradip refinery
Read moreProcurement of spares for m/s remosa s.r.l. make hydraulic valves installed in indmax unit at iocl paradip refinery
Procurement of spares for m/s remosa s.r.l. make hydraulic valves installed in indmax unit at iocl paradip refinery
Read moreProcurement of spares for traveling water screen installed in unit 1 and 2 of ph i at sgtps mppgcl birsinghpur
Procurement of spares for traveling water screen installed in unit 1 and 2 of ph i at sgtps mppgcl birsinghpur
Read moreProcurement of labyrinth steam seals for drive turbines of hp fw export pump, mp fw export pump and condensate transfer pump installed in cpp unit at iocl paradip refinery
Procurement of labyrinth steam seals for drive turbines of hp fw export pump, mp fw export pump and condensate transfer pump installed in cpp unit at iocl paradip refinery
Read moreProcurement of carbon rings for hp/mp export turbines, packings of control valves and clapper valve assembly of m/s dresser rand make steam turbines installed in cpp unit at iocl paradip refinery
Procurement of carbon rings for hp/mp export turbines, packings of control valves and clapper valve assembly of m/s dresser rand make steam turbines installed in cpp unit at iocl paradip refinery.
Read moreProcurement of spare lt motors of make cg power and industrial solutions ltd. (cgpisl) installed in rog psa unit of iocl paradip refinery.
Procurement of spare lt motors of make cg power and industrial solutions ltd. (cgpisl) installed in rog psa unit of iocl paradip
 refinery.
Read moreProcurement of ag and fg burner tips installed in 086/087-f-001 in sru unit at iocl paradip refinery
Procurement of ag and fg burner tips installed in 086/087-f-001 in sru unit at iocl paradip refinery
Read moreRectification of boiler vertical water wall fin cracks and other works in boiler as per sow at kpcl bellary tps for unit 3 1 x 700mw
Rectification of boiler vertical water wall fin cracks and other works in boiler as per sow at kpcl bellary tps for unit 3 1 x 700mw
Read moreService support for the commissioning of rheometers installed in line 1 and line 2 extruder at the risk and cost of lstk-1 contractor ms. ckcec at poly propylene unit, paradip refinery
Service support for the commissioning of rheometers installed in line 1 and line 2 extruder at the risk and cost of lstk-1 contractor ms. ckcec at poly propylene unit, paradip refinery
Read moreRectification of boiler vertical water wall fin cracks and other works in boiler as per sow at kpcl bellary tps for unit 3 1 x 700mw
Rectification of boiler vertical water wall fin cracks and other works in boiler as per sow at kpcl bellary tps for unit 3 1 x 700mw
Read moreof your Industry type