Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Design And Cost Estimate For Rehabilitation And Strengthening Of Bridge/Approach Road Of Bridge At Km 12 (210m Span) At Km 14 (75m Span) And At Km 16 (90 M Span) On Jauligrant Thano Raipur Motor Road In Distt Dehradun.
|
Description |
Design And Cost Estimate For Rehabilitation And Strengthening Of Bridge/Approach Road Of Bridge At Km 12 (210m Span) At Km 14 (75m Span) And At Km 16 (90 M Span) On Jauligrant Thano Raipur Motor Road In Distt Dehradun.
|
Organisation | PWD | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 5900 |
EMD | 50000 |
Tender Value | |
Place | Jauligrant-Thano-Raipur M/R, Km 12, 14, 16 |
Link |
AAAAAAAAAA Login to view |
Start Date | July 03, 2025 20:30 |
End Date |
08/07/2025 ( 9 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Read moreDesign and construction of 05 nos various span major minor pmt bridge on open foundation with steel superstructure through type and steel girder type and 03 nos of sub structure for modular bridges bet km 49.200 to 92.400 on nimmu padam darcha road
Design and construction of 05 nos various span major minor pmt bridge on open foundation with steel superstructure through type and steel girder type and 03 nos of sub structure for modular bridges bet km 49.200 to 92.400 on nimmu padam darcha road
Read moreDesign and construction of 120 mtr span steel superstructure (through type) major pmt bridge completed in all respect over peepani-ii nallah at km 32.200 on road hayuliang metaliang chaglohagam road of 1444 bcc sector under 48 tf in arunachal pradesh
Design and construction of 120 mtr span steel superstructure (through type) major pmt bridge completed in all respect over peepani-ii nallah at km 32.200 on road hayuliang-metaliang-chaglohagam road of 1444 bcc sector under 48 tf in arunachal pradesh
Read moreConstruction of foundation sub structure super structure main approach road and protection work at gomti river bridge golaghat on utraula ayodhya sultanpur prayagraj sh09 marg in distt sultanpur on sbd mode
Construction of foundation sub structure super structure main approach road and protection work at gomti river bridge golaghat on utraula ayodhya sultanpur prayagraj sh09 marg in distt sultanpur on sbd mode
Read moreRoad marking and other miscellaneous signage work with thermoplastic paint on bharatganj pratappur km 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22(500) 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 69-450 70 71 72 73 74 75 76 77 78 79 80 81 82 83
Road marking and other miscellaneous signage work with thermoplastic paint on bharatganj pratappur km 6 8 10 11 12 13 14 15 16 17 18 19 20 21 22(500) 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 69-450 70 71 72 73 74 75 76 77 78 79 80 81 82 83
Read moreConstr of 30 m single span major pmt br with psc box girder with open fdn including proof checking of design and drawings at km 51.700 on kohima pedi peren road under 89 rcc/15 brtf/project sewak in nagaland state
Constr of 30 m single span major pmt br with psc box girder with open fdn including proof checking of design and drawings at km 51.700 on kohima pedi peren road under 89 rcc/15 brtf/project sewak in nagaland state
Read moreDesign and cost estimate for rehabilitation and strengthening of bridge/approach road of bridge at km-12 (210m span) at km-14 (75m span) and at km-16 (90 m span) on jauligrant-thano-raipur motor road in distt dehradun.
Design and cost estimate for rehabilitation and strengthening of bridge/approach road of bridge at km-12 (210m span) at km-14 (75m span) and at km-16 (90 m span) on jauligrant-thano-raipur motor road in distt dehradun.
Read moreConstruction of high level bridge 2 span 9.0m each effective over kairon drain on link road patti to harike khalra road via kulla manihala jai singh at rd 3200 m including approaches and di pb-22-027a pmgsy-iii in distt. tarn taran
Construction of high level bridge 2 span 9.0m each effective over kairon drain on link road patti to harike khalra road via kulla manihala jai singh at rd 3200 m including approaches and di pb-22-027a pmgsy-iii in distt. tarn taran
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreA/r and m/o on nh 72 new nh 07 kala amb paonta sahib dehradun road km 46/00 to 103/00 sh construction of damaged rcc railing on markanda bridge at rd 64/780.50 to 64/803 r.h.s.
A/r and m/o on nh 72 new nh 07 kala amb paonta sahib dehradun road km 46/00 to 103/00 sh construction of damaged rcc railing on markanda bridge at rd 64/780.50 to 64/803 r.h.s.
Read moreof your Industry type