Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing Retaining Wall In Tower Location No. 292 And Tower Footing Painting Of 132 K V Cbsa Mou D/C Transmission Line From Loc No. 227 To 338 (Total 112 No. Tower) Under Transmission Sub Division Goilkera
|
| Description |
Providing Retaining Wall In Tower Location No. 292 And Tower&Amp#X0d
Footing Painting Of 132 K V Cbsa Mou D/C Transmission Line From Loc No. 227&Amp#X0d
To 338 (Total 112 No. Tower) Under Transmission Sub Division Goilkera
|
| Organisation | JSEB | State Govt. and UT |
| Tender Id | 2025_JSEB_104208_1 |
|
Reference Number |
345/PR/JUSNL/2025-26 |
| Tender Fee | 5900 |
| EMD | 33000 |
| Tender Value | - |
| Place | Goilkera |
| Link |
View Original Tender Notice
https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=140073 |
| Start Date | August 26, 2025 18:30 |
| End Date |
Expired
17/09/2025
Expired 392 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of 20 no. tower footing earth impedance measuring instrument capable of measuring tower footing impedance, resistance and inductance of transmission line towers
Supply of 20 no. tower footing earth impedance measuring instrument capable of measuring tower footing impedance, resistance and inductance of transmission line towers
Read moreStrengthening of tower footing foundation of tower loc no. 119 located at taimara hill region of 220 kv pgcil-chandil and 132 kv tamar-hatia transmission line tower by reinforcement cement casting application work at t/s/d, chandil-i
Strengthening of tower footing foundation of tower loc no. 119 located at taimara hill region of 220 kv pgcil-chandil and 132 kv tamar-hatia transmission line tower by reinforcement cement casting application work at t/s/d, chandil-i
Read moreConstruction of rr masonry/ rcc revetment wall/ hume pipe culvert at various tower 06 no. tower loc. of various 05 no. 220/132 kv ehv lines through work contract under eht-maint., division, itarsi and bina
Construction of rr masonry/ rcc revetment wall/ hume pipe culvert at various tower 06 no. tower loc. of various 05 no. 220/132 kv ehv lines through work contract under eht-maint., division, itarsi and bina
Read moreDcw-providing scaffolding works in and around for cable termination tower at loc no.25, 26 for deviation of existing 66 kv thanjavur-pirattiyur eht line and at loc no.15a, 15b 110 kv trichy-thuvakudi and 110 kv alundur-thuvakudi dc line at panjapur.
Dcw-providing scaffolding works in and around for cable termination tower at loc no.25, 26 for deviation of existing 66 kv thanjavur-pirattiyur eht line and at loc no.15a, 15b 110 kv trichy-thuvakudi and 110 kv alundur-thuvakudi dc line at panjapur.
Read moreTower footing protection of loc 96 rampur nalagarh transmission line
Tower footing protection of loc.96 rampur-nalagarh transmission line
Read moreProcurement of tower footing impedance measurement kit
Procurement of tower footing impedance measurement kit
Read moreSupply of 12 no. tower footing earth impedance measuring instrument capable of measuring tower footing impedance, resistance, and inductance of transmission line towers
Supply of 12 no. tower footing earth impedance measuring instrument capable of measuring tower footing impedance, resistance, and inductance of transmission line towers
Read moreSupply of acsr twin moose double tension hardware fitting for di works of tower loc. nos. 224 227, tower loc no 144 and tower loc 272 of 400 kv kishenpur wanpoh iii iv transmission line
Supply of acsr twin moose double tension hardware fitting for di works of tower loc. nos. 224 227, tower loc no 144 and tower loc 272 of 400 kv kishenpur wanpoh iii iv transmission line
Read moreConstruction of chemical earthing, supply and installation of acd and tower footing painting work in 132kv rajkharsawan-goilkera s/c transmission line under the jurisdiction of transmission sub-division goilkera
Construction of chemical earthing, supply and installation of acd and tower footing painting work in 132kv rajkharsawan-goilkera s/c transmission line under the jurisdiction of transmission sub-division goilkera
Read moreFor leg stregthening work of tower loc-18 and loc 90 of 132kv amroha moradabad line under etd amroha
For leg stregthening work of tower loc-18 and loc 90 of 132kv amroha moradabad line under etd amroha
Read moreof your Industry type