Tender Details

Particulars Details
Title
Repairing Overhauling Of 04 Four Nos Failed Swing Brake Assembly Of P And H 2300 Xpa Lr Shovel Of Rajmahal Project
Description
Repairing Overhauling Of 04 Four Nos Failed Swing Brake Assembly Of P And H 2300 Xpa Lr Shovel Of Rajmahal Project
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_ECL_329225_1
Reference
Number
ECL/RJML/GM(EXCV)/ 24-25/E-TEN/280 DT 14.02.2025
Tender Fee 0
EMD 12500
Tender Value
Place RAJMAHAL AREA, DHANKUNDA, PO-BARASIMRA, DIS-GODDA
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=341243
Start Date February 16, 2025 14:30
End Date

27/02/2025 ( Expired 54 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Special repair of 04 nos ber lifts of block no 62, 63 and 64 at manekshaw marg under ge (u) p and m delhi cantt-10

Special repair of 04 nos ber lifts of block no 62, 63 and 64 at manekshaw marg under ge (u) p and m delhi cantt-10

Read more
Work contract for overhauling an repairing of vacuum cylinder /air cylinder and associated parts and other related works of vacuum brake /air brake system of bgh wagons and complete servicing /overhauling of old buffer assembly installed in bgh wagon

Work contract for overhauling an repairing of vacuum cylinder /air cylinder and associated parts and other related works of vacuum brake /air brake system of bgh wagons and complete servicing /overhauling of old buffer assembly installed in bgh wagon

Read more
Repairing of 02 nos roll back cylinder 02 nos lift cylinder 02 nos steering cylinder lhd 02 nos push ram cylinder lhd machine no 953 or 886 01 no bucket motor lhd mc no 953 for eimco elecon make 811 lhd and repairing of 04 nos of h

Repairing of 02 nos roll back cylinder 02 nos lift cylinder 02 nos steering cylinder lhd 02 nos push ram cylinder lhd machine no 953 or 886 01 no bucket motor lhd mc no 953 for eimco elecon make 811 lhd and repairing of 04 nos of h&#x0d

Read more
Annual maintenance contract for air conditioner fitted in p and h- 1900al, sl. no. 3 shovel of khadia project for a period of 365 days.

Annual maintenance contract for air conditioner fitted in p and h- 1900al, sl. no. 3 shovel of khadia project for a period of 365 days.

Read more
Repairing of 04 nos. 3.3kv ht motor and rotor of potanga quarry under urimari ocp.

Repairing of 04 nos. 3.3kv ht motor and rotor of potanga quarry under urimari ocp.

Read more
Repairing/rebuilding of worn out housing of arm(02 no.), boom (02 nos. ) boom cylinder foot pin ( 02 nos.), arm cylinder eye (04 nos.), boom foot housing (02 no.) and bucket cylinder eye (02 nos.) and then co-axial line boring to its original size i

Repairing/rebuilding of worn out housing of arm(02 no.), boom (02 nos. ) boom cylinder foot pin ( 02 nos.), arm cylinder eye (04 nos.), boom foot housing (02 no.) and bucket cylinder eye (02 nos.) and then co-axial line boring to its original size i

Read more
Sict of 4 nos 150 ltr capacity water cooler 4 kva steplizer water coolar cage pipe line connection and cabling construction of 04 tubewell pump 04 nos sf of 12.5 h cabling etc work at nmy firozabad

Sict of 4 nos 150 ltr capacity water cooler 4 kva steplizer water coolar cage pipe line connection and cabling construction of 04 tubewell pump 04 nos sf of 12.5 h cabling etc work at nmy firozabad

Read more
Repairing/overhauling of 03 nos. of pumps(02 nos. of flowmore make pump, model no fm 590 bd 250x200,3 stage (duty parameters 120lpsx250 mtrs) pump and 01 nos. of fm 590 bd 250x200,3 stage (duty parameters 180lpsx250 mtrs) ) as per the direction

Repairing/overhauling of 03 nos. of pumps(02 nos. of flowmore make pump, model no fm 590 bd 250x200,3 stage (duty parameters 120lpsx250 mtrs) pump and 01 nos. of fm 590 bd 250x200,3 stage (duty parameters 180lpsx250 mtrs) ) as per the direction

Read more
Repairing / overhauling of 4 nos. (2 nos. meditron and 2 nos. electroteknica) make vcb panels, 6.6 kv/3.3 kv at main substation of dipka expansion project.

Repairing / overhauling of 4 nos. (2 nos. meditron and 2 nos. electroteknica) make vcb panels, 6.6 kv/3.3 kv at main substation of dipka expansion project.

Read more
Repairing and strengthening of ep funnel assembly and hard facing of their splitters during capital overhauling of unit6 of 2x250mw, ptpp, parichha, jhansi

Repairing and strengthening of ep funnel assembly and &amp#x0d hard facing of their splitters during capital overhauling of &amp#x0d unit6 of 2x250mw, ptpp, parichha, jhansi

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise