Tender Details
Particulars | Details |
---|---|
Title |
Dismantling Of Ventilation Fan Two Rcc Pillars For Widening Of Haulage Incline For Marching Of Lhcm And Other Machineries Of Seam V Mine Ncph Colliery
|
Description |
Dismantling Of Ventilation Fan Two Rcc Pillars For Widening Of Haulage Incline For Marching Of Lhcm And Other Machineries Of Seam V Mine Ncph Colliery
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_SECL_329800_1 |
Reference Number |
SECL/CHRM/ Dy. GMC/24-25/e-Tender/68 dt. 21/02/2025 |
Tender Fee | 0 |
EMD | 2300 |
Tender Value | |
Place | CHIRIMIRI AREA |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=341840 |
Start Date | February 22, 2025 23:30 |
End Date |
27/02/2025 ( Expired 53 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Installation of 03 (three) nos. endless haulage at (9r/16xcut, 41r/25xcut and 49r/25xcut) mk seam and two-time complete pulley shifting of haulage installed at 49r/25xcut in every 200m at bhadra 7/8 ug mine, bhadra sub-area, jamuna kotma area.
Installation of 03 (three) nos. endless haulage at (9r/16xcut, 41r/25xcut and 49r/25xcut) mk seam and two-time complete pulley shifting of haulage installed at 49r/25xcut in every 200m at bhadra 7/8 ug mine, bhadra sub-area, jamuna kotma area.
Read moreWork for sealing of the entries by constructing 03 nos explosion proof stopping of rcc wall for 03 nos of adits and 01nos isolation stopping of r.c.c. wall for the airshaft of no 3 seam of ncph colliery r6 mine.
Work for sealing of the entries by constructing 03 nos explosion proof stopping of rcc wall for 03 nos of adits and 01nos isolation stopping of r.c.c. wall for the airshaft of no 3 seam of ncph colliery r6 mine.
Read moreWhite washing along travelling roadway and haulage roadway for proposed panel no nk s in kenda seam working of nj unit of bahula colliery under kenda area ecl
White washing along travelling roadway and haulage roadway for proposed panel no nk s in kenda seam working of nj unit of bahula colliery under kenda area ecl
Read moreWork for construction of 01 no of support wall for pillar strengthen near existing underground strata bunker at 20e 1n of seam v at ncph colliery r-6 mine
Work for construction of 01 no of support wall for pillar strengthen near existing underground strata bunker at 20e 1n of seam v at ncph colliery r-6 mine
Read moreInstallation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla
Installation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla
Read moreConstruction of 52 nos. rcc ventilation stopping in b30, b31 and 3 rise section at seam vi(b) of khairaha u.g. mine
Construction of 52 nos. rcc ventilation stopping in b30, b31 and 3 rise section at seam vi(b) of khairaha u.g. mine
Read moreConstruction of 19 (nineteen) nos. rcc isolation stopping for sealing of p-9b and p-9c proposed depillaring panel in l.k.ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.
Construction of 19 (nineteen) nos. rcc isolation stopping for sealing of p-9b and p-9c proposed depillaring panel in l.k.ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.
Read moreDismantling and erection of 220 v oh electric oh line for lighting of the a patch pump location, in mine, w.r.t. karo ocp, under bnk area.
Dismantling and erection of 220 v oh electric oh line for lighting of the a patch pump location, in mine, w.r.t. karo ocp, under bnk area.
Read moreConstruction of 15 nos ventilation stopping by brick from 0d to 10ed in between 33l and 34l and 34l to 37l in between 10ed and 11ed of proposed panel e2 bott dep stow district in working of rvi chora seam for chora 7 and 9 pit colliery under kenda ar
Construction of 15 nos ventilation stopping by brick from 0d to 10ed in between 33l and 34l and 34l to 37l in between 10ed and 11ed of proposed panel e2 bott dep stow district in working of rvi chora seam for chora 7 and 9 pit colliery under kenda ar
Read moreDismantling, laying, periodical shortening, line packing and cleaning of haulage track along 15ls from -22rise to 40dip and -40dip from 15ls to 28l roadway in propose (-)39dip dep. panel in seam c at kurja sheetaldhara ug mine. quantity laying 995.0
Dismantling, laying, periodical shortening, line packing and cleaning of haulage track along 15ls from -22rise to 40dip and -40dip from 15ls to 28l roadway in propose (-)39dip dep. panel in seam c at kurja sheetaldhara ug mine. quantity laying 995.0
Read moreof your Industry type