Tender Details

Particulars Details
Title
Construction Of Rcc 3 (Three) Storied Gr I Judicial Quarter 4 (Four) Unit Goalpara (Earth Cutting And Filling With Low Side Filling And Approach Road) (Additional Works)
Description
Construction Of Rcc 3 (Three) Storied Gr I Judicial Quarter 4 (Four) Unit Goalpara (Earth Cutting And Filling With Low Side Filling And Approach Road) (Additional Works)
Organisation Government of Assam
Tender Id 2023_PWBNH_33447_1
Reference
Number
TW-1/SE/GBC/2021-22/352-A, Dt. 20-10-2023
Tender Fee 3100
EMD 3.03 Lakh
Tender Value -
Place S.E PWD Goalpara Building Circle, Goalpara
Link
View Original Tender Notice

https://assamtenders.gov.in

Start Date November 02, 2023 19:30
End Date
Expired 22/11/2023

Expired 1058 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Repair and renovation of two storied 3(three) nos doctors quarters, 1storied 1 mo,2 storied 4(four) nos nurses quarters, single storied 10 gr - d type and 4 gr-b type staff quarter at nashibpur bphc, murshidabad.---e.i work

Repair and renovation of two storied 3(three) nos doctors quarters, 1storied 1 mo,2 storied 4(four) nos nurses quarters, single storied 10 gr - d type and 4 gr-b type staff quarter at nashibpur bphc, murshidabad.---e.i work

Read more
Supplying and earth filling in proposed bus stand low lying site area at venkulamkarai in kollencode municipality.

Supplying and earth filling in proposed bus stand low lying site area at venkulamkarai in kollencode municipality.

Read more
Const of approach earth filling gravelling at 33 kv ss baghera under aen o and m kekri

Const of approach earth filling gravelling at 33 kv ss baghera under aen o and m kekri

Read more
Repair and renovation of two storied 3(three) nos doctors quarters 2(two) storied 4(four) nos nurses quarters and bmoh quarter at salar rh under bharatpur -ii block, murshidabad.

Repair and renovation of two storied 3(three) nos doctors quarters 2(two) storied 4(four) nos nurses quarters and bmoh quarter at salar rh under bharatpur -ii block, murshidabad.

Read more
Repair and renovation of two storied 3(three) nos doctors quarters 2(two) storied 4(four) nos nurses quarters and bmoh quarter at salar rh under bharatpur -ii block, murshidabad

Repair and renovation of two storied 3(three) nos doctors quarters 2(two) storied 4(four) nos nurses quarters and bmoh quarter at salar rh under bharatpur -ii block, murshidabad

Read more
Construction of approach road at bemina chowk connecting with bund road by way of retaining wall, earth filling and other allied items.

Construction of approach road at bemina chowk connecting with bund road by way of retaining wall, earth filling and other allied items.

Read more
Cutting of grass, pruning of trees, shrub, bushes upto boundary including clearing the dry grass outside md land and filling of earth in both side of low lying area of runway at shibpur under (s) diglipur

Cutting of grass, pruning of trees, shrub, bushes upto boundary including clearing the dry grass outside md land and filling of earth in both side of low lying area of runway at shibpur under (s) diglipur

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Additional estimate for the construction of rcc 3 (three) storied gr-i judicial officer quarter 4 (four) units at goalpara

Additional estimate for the construction of rcc 3 (three) storied gr-i judicial officer quarter 4 (four) units at goalpara

Read more
Construction of boundary wall at gr-i judicial quarter campus at bhalukdubi in goalpara district, assam

Construction of boundary wall at gr-i judicial quarter campus at bhalukdubi in goalpara district, assam

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise