Tender Details

Particulars Details
Title
Fabrication And Erection Of (A) Carrier Roller Frame Size (7 Nos.) 1520 Mm With Different Roller Size And Size Of 127x422x456 Mm With Repair Of Rollers Shaft And Fitting To The Same In By Pass B/C (B) Carrier Roller Frame Size 1520 Mm (41 Nos.) With
Description
Fabrication And Erection Of (A) Carrier Roller Frame Size (7 Nos.) 1520 Mm With Different Roller Size And Size Of 127x422x456 Mm With Repair Of Rollers Shaft And Fitting To The Same In By Pass B/C (B) Carrier Roller Frame Size 1520 Mm (41 Nos.) With
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_313075_1
Reference
Number
SGW/KTA/ENM/E-Tender/24-25/50 Date 20.07.2024
Tender Fee 0
EMD 2600
Tender Value
Place Office of the Project Officer, Sawang Washery
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=324431
Start Date July 22, 2024 16:30
End Date

31/07/2024 ( Expired 264 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Works of prive and breakdown maintenance of conveyor systems and different auxiliaries of chp also repair/ rectification, overhauling, installation of different size conveyor roller of chp-a and chp-b, obra tps

Works of prive and breakdown maintenance of conveyor systems and different auxiliaries of chp also repair/ rectification, overhauling, installation of different size conveyor roller of chp-a and chp-b, obra tps obra

Read more
Drawal of 01 nos 11 kv feeder by laying of 11kv 3c x 400 sq mm xlpe cables along with supply of jointing kits from nt aa ic substation and connecting with dss 37 rmu at c block for system improvement work under newtown division

Drawal of 01 nos 11 kv feeder by laying of 11kv 3c x 400 sq mm xlpe cables along with supply of jointing kits from nt aa ic substation and connecting with dss 37 rmu at c block for system improvement work under newtown division

Read more
Design, manufacturing, testing,supplying, erection and commissioning of cast steel slanted seated non valve 1200 mm dia with by-pass arrangement at ambhora stage-2 lift irrigation scheme,dist. nagpur.

Design, manufacturing, testing,supplying, erection and commissioning of cast steel slanted seated non valve 1200 mm dia with by-pass arrangement at ambhora stage-2 lift irrigation scheme,dist. nagpur.

Read more
Replacement of 9 nos. of damaged tubular pole by 8 mtrs. pcc pole and erection of 2 new, 8 mtrs. pcc pole in 440v oh line of ara b-type colony along with erection of 21 nos. of fresh cradling and 9 nos. of new stay sets, in 440v oh line of ara colony

Replacement of 9 nos. of damaged tubular pole by 8 mtrs. pcc pole and erection of 2 new, 8 mtrs. pcc pole in 440v oh line of ara b-type colony along with erection of 21 nos. of fresh cradling and 9 nos. of new stay sets, in 440v oh line of ara colony

Read more
Replacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .

Replacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .

Read more
Repair of damaged track frame(rhs) and damaged idler assy., yoke, yoke shaft, carrier roller assy. support changing work in dozer d355,sl no. 11842 from grounding dozer.

Repair of damaged track frame(rhs) and damaged idler assy., yoke, yoke shaft, carrier roller assy. support changing work in dozer d355,sl no. 11842 from grounding dozer.

Read more
Design, manufacturing, testing,supplying, erection and commissioning of cast steel slanted seated non valve 1200 mm dia with by-pass arrangement at ambhora stage-2 lift irrigation scheme dist. nagpur.

Design, manufacturing, testing,supplying, erection and commissioning of cast steel slanted seated non valve 1200 mm dia with by-pass arrangement at ambhora stage-2 lift irrigation scheme,dist. nagpur.

Read more
Kaotha project fabrication and fitting of centre drive unit canopy for the hoist of vl gate 15x9 8 nos and 15x6 5 nos modification of existing dogging beam arrangements resetting of existing guide tee of vi gate fabrication and erection of roller

Kaotha project fabrication and fitting of centre drive unit canopy for the hoist of vl gate 15x9 8 nos and 15x6 5 nos modification of existing dogging beam arrangements resetting of existing guide tee of vi gate fabrication and erection of roller

Read more
Fabrication and erection of rcc tank by pass pipe line 6 inch dia water column to rlb new bunker side including valve fitting etc in rlb section of kathara washery

Fabrication and erection of rcc tank by pass pipe line 6 inch dia water column to rlb new bunker side including valve fitting etc in rlb section of kathara washery

Read more
(a) making of pumping accessories like bend, nipples etc for golepahari pump house and dhori east pump house (b) erection of 250 m 4 inch dia pipe line along with a 4 inch dia tanker point (c) fabrication of three number rest shelter in respect of aa

(a) making of pumping accessories like bend, nipples etc for golepahari pump house and dhori east pump house (b) erection of 250 m 4 inch dia pipe line along with a 4 inch dia tanker point (c) fabrication of three number rest shelter in respect of aa

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise