Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Major And Important Bridges And Other Ancillary Works From Adarsh Nagar (Including) To Raila Road (Including) Between Km 4/6 To Km 99/0 In Connection With Doubling Of Ajmer Chanderiya In Ajmer Division Of North Western Railway
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 75158916 |
Reference Number |
NWR-SC-AII-COR-T-3 |
Tender Fee | 0 |
EMD | 59.49 Lakh |
Tender Value | |
Place | Jaipur |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/092024/75158916/viewNitPdf_4572942.pdf |
Start Date | August 24, 2024 22:01 |
End Date |
25/09/2024 ( Expired 207 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
South central railway construction organization-engineering, procurement and construction (epc) contract for doubling of track between manyamkonda station (excl)& perur station(incl) from km 128.200 to km 156.700(28.500 km) including electrification & signaling works in connection with doubling of mahabubnagar-dhone section in the state of telangana.
For complete deion and other details, please refer to tender
Read moreCivil works incl earthwork for railway formation, blanketing, minor,major bridges,rubs and ror works of ror line urga..in constr of..single railway line for cerl phase from urga (km 0.00) to dharamjaygarh (km 62.00) in chhattisgarh over secr
Civil works incl earthwork for railway formation, blanketing, minor,major bridges,rubs and ror works of ror line urga..in constr of..single railway line for cerl phase from urga (km 0.00) to dharamjaygarh (km 62.00) in chhattisgarh over secr
Read moreMtc of road from north anandanagar market to anandanagar 6 no para via 4 no para (l_1 point 00 km) under dukli sub division, pwd (rnb) during the year 2025_26_sh_protection wall, road side drain and other allied works (group_i)
Mtc of road from north anandanagar market to anandanagar 6 no para via 4 no para (l_1 point 00 km) under dukli sub division, pwd (rnb) during the year 2025_26_sh_protection wall, road side drain and other allied works (group_i)
Read moreFdr to reconstruction of damaged, narrow pipe culverts from km 0/0 to 10/0 (12nos), construction of drain in kulaspur village limits from km 3/8-10 and strengthening of road in mullangi village limits from km 7/4-8 on mogpal to nh-44 (via) kanjar, kulaspur dichpally railway station road and lead road to kanjar from km 0/0 to 15/4 in nizamabad district.
Fdr to reconstruction of damaged, narrow pipe culverts from km 0/0 to 10/0 (12nos), construction of drain in kulaspur village limits from km 3/8-10 and strengthening of road in mullangi village limits from km 7/4-8 on mogpal to nh-44 (via) kanjar, kulaspur dichpally railway station road and lead road to kanjar from km 0/0 to 15/4 in nizamabad district.
Read moreSub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Sub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Read moreConstruction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway
Construction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway
Read moreAdditional rob and approach ramps in between siliguri town railway station to siliguri jn. rly. station at 5/6 km. rly. post and in between air view more to jhankar more on sh 12a (burwan road), darjeeling
Additional rob and approach ramps in between siliguri&#x0d town railway station to&#x0d siliguri jn. rly. station at&#x0d 5/6 km. rly. post and in&#x0d between air view more to&#x0d jhankar more on sh 12a&#x0d (burwan road), darjeeling street lighting works.
Read moreWidening from single lane to two lane and strengthening in km 0/0-3/2 and 5/6-9/4 and widening from intermediate lane to two lane in km 3/2-5/6 of mehalathur-pathalapettai road
Widening from single lane to two lane and strengthening in km 0/0-3/2 and 5/6-9/4 and widening from intermediate lane to two lane in km 3/2-5/6 of mehalathur-pathalapettai road
Read moreSdf/2024/491 ( restoration of rain damages on harsour garli road km. 0/0 to 6/0 sdf /2024/495 ( r/o restoration of rain damages on badaran garli via gallian jole km. 4/0 to 22/500
Repair pot holes and v-shape drain at various rds. in between km. 0/0 to 6/0 4/0 to 22/500 respectively )
Read moreConstruction of road over bridge at km 0/6 of thaneerpandal road in lieu of existing lc.no.6 at railway km 6/15-17 in between singanallur - peelamedu railway stations (road over bridge and approach road only).
Construction of road over bridge at km 0/6 of thaneerpandal road in lieu of existing lc.no.6 at railway km 6/15-17 in between singanallur - peelamedu railway stations (road over bridge and approach road only).
Read moreof your Industry type