Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Aden Porbandar Sub Division : Strengthening Of Loop Lines By Isd (With Deep Screening) And Con To Lwr 14.070 Tkm Against The Work Sanction Bhavnagar Division Strengthening Of Loop Lines By Isd (With Deep Screening) And Con To Lwr 37.887 Tkm.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 73962277 |
Reference Number |
160-2023-24-R1 |
Tender Fee | 0 |
EMD | 2.82 Lakh |
Tender Value | |
Place | Mumbai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/032024/73962277/viewNitPdf_4500445.pdf |
Start Date | March 05, 2024 00:30 |
End Date |
26/03/2024 ( Expired 465 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Work of erection of octagonal streetlight poles with single arm/double arm/three arm and four arm for illumination of two pathways leading to st. anthony church vagator, under the jurisdiction of section office anjuna,sub division-ii, divxvii,mapusa.
Work of erection of octagonal streetlight poles with single arm/double arm/three arm and four arm for illumination of two pathways leading to st. anthony church vagator, under the jurisdiction of section office anjuna,sub division-ii, divxvii,mapusa.
Read moreEmergent repairing work of bblr (sh-11a) from 58.770 km to 58.99 km by providing gsb-iii, wmm layer, bm, p.c. s.c. and side shoulders by jhama moorum consolidation etc. under jangipur sub-division under berhampore division no.-i, p.w.d during 25-26
Emergent repairing work of bblr (sh-11a) from 58.770 km to 58.99 km by providing gsb-iii, wmm layer, bm, p.c. s.c. and side shoulders by jhama moorum consolidation etc. under jangipur sub-division under berhampore division no.-i, p.w.d during 2025-
Read moreBalance shore protection work by u type hot rolled steel sheet pile and other ancillary work in connection with construction of shore protection against massive erosion to save century old igwtp of m/s kolkata municipal corporation (kmc)
Balance shore protection work by u type hot rolled steel sheet pile and other ancillary work in connection with construction of shore protection against massive erosion to save century old igwtp of m/s kolkata municipal corporation (kmc)
Read moreThe work against sanction deposit package no. d-557 to d-561 and d-562 to d-565 under the jurisdiction of electricity distribution division bijnor.
The work against sanction deposit package no. d-557 to d-561 and d-562 to d-565 under the jurisdiction of electricity distribution division bijnor.
Read moreRepairing work of bblr (sh-11a) from 63.600 km to 64.220 km by providing repairing pot-holes and making up small depressions, 20mm thick pc and seal coat (type-b) and side shoulders by jhama moorum consolidation etc. under jangipur sub-division under
Repairing work of bblr (sh-11a) from 63.600 km to 64.220 km by providing repairing pot-holes and making up small depressions, 20mm thick pc and seal coat (type-b) and side shoulders by jhama moorum consolidation etc. under jangipur sub-division under
Read moreTender for replacement of rotten wooden x- arm with steel channel iron and m.s angle iron fittings from larot to chanshal to strengthening the ht line structure in section larot under electrical sub- division hpsebl chirgaon no - ii
Tender for replacement of rotten wooden x- arm with steel channel iron and m.s angle iron fittings from larot to chanshal to strengthening the ht line structure in (e section larot under electrical sub- division hpsebl chirgaon no - ii
Read moreRepair and maintenance of infrastructure assets in r-ii division during 2025-26. sh - hiring of tempo with hydraulic jack (bs-latest standard) at tughlak lane service centre (sub division-i) for day to day maintenance work.
Repair and maintenance of infrastructure assets in r-ii division during 2025-26. sh - hiring of tempo with hydraulic jack (bs-latest standard) at tughlak lane service centre (sub division-i) for day to day maintenance work.
Read moreEoi invited for association as sub-contractor through pre-bid tie up for earthwork, blanketing and construction of major bridges, minor bridges etc required for the successful completion of work from sabarmati cabin to sarkhej of bhavnagar division
Eoi invited for association as sub-contractor through pre-bid tie up for earthwork, blanketing and construction of major bridges, minor bridges etc required for the successful completion of work from sabarmati cabin to sarkhej of bhavnagar division
Read moreSupply and installation of 1.5 ton 5 star, split inverter ac white, copper condenser (make hitachi or lg or panasonic or daikin or blue star) with latest model. (all materials to be supplied by agency) under tamluk(a m) sub division under non plan
Supply and installation of 1.5 ton 5 star, split inverter ac white, copper condenser (make hitachi or lg or panasonic or daikin or blue star) with latest model. (all materials to be supplied by agency) under tamluk(a m) sub division under non plan
Read moreRoad restoration of various roads under sub-division wr-15 and 13, division wr-1 (m-111), during 2025-26. (sh road restoration work due to road cut by djb/bses/mcd without permission in rajouri garden constituency and tilak nagar constituency.
Road restoration of various roads under sub-division wr-15 and 13, division wr-1 (m-111), during 2025-26. (sh road restoration work due to road cut by djb/bses/mcd without permission in rajouri garden constituency and tilak nagar constituency.
Read moreof your Industry type