Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing Of Sluice Well Platform Along With Construction Of Its Ramp Overtopping Of Bund In Bandhi Tank Under Sub Div No 03 Kundam Jabalpur Mp
|
| Description |
Repairing Of Sluice Well Platform Along With
Construction Of Its Ramp Overtopping Of Bund In Bandhi Tank
Under Sub Div No 03 Kundam Jabalpur Mp
|
| Organisation | Government of Madhya Pradesh |
| Tender Id | 2023_WRD_315860_1 |
|
Reference Number |
nit no 02/02/sac |
| Tender Fee | 2000 |
| EMD | 7420 |
| Tender Value | |
| Place | O/o EE, HIRAN WATER RESOURCES DIVISION JABALPUR |
| Link |
View Original Tender Notice
https://mptenders.gov.in |
| Start Date | December 05, 2023 16:00 |
| End Date |
Expired
12/12/2023
Expired 910 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Maintenance of ci/di/pvc pipe line in/c construction of sluice valve chamber, hydrant post platform etc. complete at different existing dtw schemes of ganganagar r.d block under dws sub-division ambassa.(gr-i).
Maintenance of ci/di/pvc pipe line in/c construction of sluice valve chamber, hydrant post platform etc. complete at different existing dtw schemes of ganganagar r.d block under dws sub-division ambassa.(gr-i).
Read moreMaintenance of ci/di/pvc pipe line in/c construction of sluice valve chamber, hydrant post platform etc. complete at different existing dtw schemes of raishyabari r.d block under dws sub-division gandacherra .(gr-i).
Maintenance of ci/di/pvc pipe line in/c construction of sluice valve chamber, hydrant post platform etc. complete at different existing dtw schemes of raishyabari r.d block under dws sub-division gandacherra .(gr-i).
Read moreMaintenance of ci/di/pvc pipe line in/c construction of sluice valve chamber, hydrant post platform etc. complete at different existing dtw schemes of ambassa r.d block under dws sub-division ambassa.(gr-i).
Maintenance of ci/di/pvc pipe line in/c construction of sluice valve chamber, hydrant post platform etc. complete at different existing dtw schemes of ambassa r.d block under dws sub-division ambassa.(gr-i).
Read moreConstruction of boundary wall along with rcc retaining wall in the allotted land of lok bhavan in rs plot no. 2132/p, mouja kunjaban under capital complex sub-division-i, pwd (b), kunjaban extension, agartala.
Construction of boundary wall along with rcc retaining wall in the allotted land of lok bhavan in rs plot no. 2132/p, mouja kunjaban under capital complex sub-division-i, pwd (b), kunjaban extension, agartala.
Read moreWork of repair and maintenance of pipe line along with road restoration work under rnd sub. division beawar in the jurisdiction of division beawar
Work of repair and maintenance of pipe line along with road restoration work under rnd sub. division beawar in the jurisdiction of division beawar
Read more03/ee/div-iv/housing (bsup)/kmda of 2026-2027
Emergency repairing of underground blockage sewerage line and construction of new inspection pit, yard gully at block no. 10a, 7c, 6 in kit housing scheme no. sih-ii under housing (bsup) sector, kmda
Read moreTransmission line package tl01 associated with di of 765 kv d/c dharamjaygarh-jabalpur ckt i and ii transmission line coming in submergence area of proposed construction of raghavpur multipurpose project in the state of mp by narmada valley development authority (nvda)
Transmission line package tl01 associated with di of 765 kv d/c dharamjaygarh-jabalpur ckt i and ii transmission line coming in submergence area of proposed construction of raghavpur multipurpose project in the state of mp by narmada valley development authority (nvda)
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreConstruction of enclosed platform with fibre glass sculptures in green belt portion i and ii indira colony, manimajra, chandigarh under ward development fund.
Construction of enclosed platform with fibre glass sculptures in green belt portion i and ii&#x0d indira colony, manimajra, chandigarh under ward development fund. &#x0d
Read moreConstruction and repairing work on the occasion of shrawani mela 2026 at several places i.e. (1) lying of kota stone along the lining path of shiv ganga in ward no-10 under nagar panchayat basukinath,(2) construction of chain fencing from pipal vr
Construction and repairing work on the occasion of shrawani mela 2026 at several places i.e. (1) lying of kota stone along the lining path of shiv ganga in ward no-10 under nagar panchayat basukinath,(2) construction of chain fencing from pipal vr
Read moreof your Industry type