Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Of Pennant Make Thermodynamic Steam Traps For Installing In Various Drain Lines Connected To Prds Station At Turbine Maintenance Division
|
| Description |
Supply Of Pennant Make Thermodynamic Steam Traps For Installing In Various Drain Lines Connected To Prds Station At Turbine Maintenance Division
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 644250 |
|
Reference Number |
252/2025-26/CE/OM/KTPP/TM-I/SD-III |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | November 18, 2025 22:30 |
| End Date |
Expired
11/12/2025
Expired 311 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Bucket, inverted, steam trap, cs, nb-25mm,bucket, inverted, steam trap, cs, nb-40mm,steam trap, thermodynamic, ss, nb-20mm,steam trap, thermodynamic, ss, nb-25mm
Bucket, inverted, steam trap, cs, nb-25mm,bucket, inverted, steam trap, cs, nb-40mm,steam trap, thermodynamic, ss, nb-20mm,steam trap, thermodynamic, ss, nb-25mm
Read moreSteam trap td hp cmpt 5 vlv sw 20 nb,steam trap sw hp 20nb,steam trap thermodynamic utd120 20nb
Steam trap td hp cmpt 5 vlv sw 20 nb,steam trap sw hp 20nb,steam trap thermodynamic utd120 20nb
Read moreSingle stage, vertical, back pressure steam turbine
Supply, erection and commissioning of single stage, vertical, back pressure steam turbine
Read moreDe-scaling of condenser tubes by hydro jet cleaning of steam turbine condenser, whru at gas turbine power station
As per tender documents
Read moreProcurement for steam turbine coupling studs and bolts at dgps at ntpc dadri
Procurement for steam turbine coupling studs and bolts at dgps at ntpc dadri
Read moreMain steam turbine control fluid system spares for accumulator bladder assembly model: s-35-b-m50-c,main steam turbine control fluid system spares for accumulator bladder assembly model: s-55-b-m50-c-,main steam turbine control fluid system spares for accumulator bladder assembly model: s-55-b-m50-c-,drive turbine governing oil system spares for accumulator bladder assembly model: s-35-b-m50-c-v cap
Main steam turbine control fluid system spares for accumulator bladder assembly model: s-35-b-m50-c,main steam turbine control fluid system spares for accumulator bladder assembly model: s-55-b-m50-c-,main steam turbine control fluid system spares for accumulator bladder assembly model: s-55-b-m50-c-,drive turbine governing oil system spares for accumulator bladder assembly model: s-35-b-m50-c-v cap
Read moreSteam trap, t dynamic, 3/4in, sw, td120, ibr,stm trp, a105n/216-wcb, tr-316, fl, 2in, 150,hp thermodynamic trap, 20mm,s-trap, t. dyn, a217wc6, 304, fl, 600, 3/4inibr
Steam trap, t dynamic, 3/4in, sw, td120, ibr,stm trp, a105n/216-wcb, tr-316, fl, 2in, 150,hp thermodynamic trap, 20mm,s-trap, t. dyn, a217wc6, 304, fl, 600, 3/4inibr
Read moreof your Industry type