Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 1 No. 40m. Nblw Ground Based Tower Foundation Including Dg Platform And Ring Earth Inside Ndrf Campus, Munduli, Cuttack.
|
| Description |
Construction Of 1 No. 40m. Nblw Ground Based Tower Foundation Including Dg Platform And Ring Earth Inside Ndrf Campus, Munduli, Cuttack.
|
| Organisation | Bharat Sanchar Nigam Limited (Govt of India Enterprise) | Public Sector Undertakings |
| Tender Id | 2026_BSNL_277099_1 |
|
Reference Number |
06/CE(C)/2026-27/BCD/CTC |
| Tender Fee | 590 |
| EMD | 16275 |
| Tender Value | - |
| Place | NDRF Munduli |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=323620 |
| Start Date | May 11, 2026 18:30 |
| End Date |
Expired
19/05/2026
Expired 150 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of tower foundation bts platform erection of 40m tower nblw nbfl make at vaious locations aprox 16 nos for kumbh mela at nashik 2027 2nd call
Construction of tower foundation bts platform erection of 40m tower nblw nbfl make at vaious locations aprox 16 nos for kumbh mela at nashik 2027 2nd call
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreConstruction of 1 no. 40m nblw ground based tower foundation including dg platform od plinth and ring earth near ssm office inside rsp compound under rourkela ba
Construction of 1 no. 40m nblw ground based tower foundation including dg platform od plinth and ring earth near ssm office inside rsp compound under rourkela ba
Read moreConstruction of 4 no. 40m. nblw ground based tower foundation including dg platform and ring earth in kalahandi district under under bsnl oa bhawanipatna
Construction of 4 no. 40m. nblw ground based tower foundation including dg platform and ring earth in kalahandi district under under bsnl oa bhawanipatna
Read moreConstruction of 1 no. 40m. nblw ground based tower foundation including dg platform and ring earth at fm medical college and hospital site, balasore .
Construction of 1 no. 40m. nblw ground based tower foundation including dg platform and ring earth at fm medical college and hospital site, balasore ..
Read moreConstruction of 1 no 40m nblw ground based tower foundation including ring earth near sakhigopal te under bhubaneswar ba
Construction of 1 no 40m nblw ground based tower foundation including ring earth near sakhigopal te under bhubaneswar ba
Read moreConstruction of foundation for 1 no. 40m nblw ground based tower including dg platform, od plinth and ring earth at osap 1st batallion barrack, dhenkanal
Construction of foundation for 1 no. 40m nblw ground based tower including dg platform, od plinth and ring earth at osap 1st batallion barrack, dhenkanal
Read moreConstruction of 1 no. 40m nblw ground based tower foundation including dg platform od plinth and ring earth near durga mandap inside nit campus, under rourkela ba including soil testing of site
Construction of 1 no. 40m nblw ground based tower foundation including dg platform od plinth and ring earth near durga mandap inside nit campus, under rourkela ba including soil testing of site
Read moreDismantling and transportation of 40m nblw tower and demolishing its foundation at shigaon dist sangli
Dismantling and transportation of 40m nblw tower and demolishing its foundation at shigaon dist sangli
Read moreof your Industry type