Title
L Pre Monsoon Flood Mitigation Work 2024 Desiltation Removal Of Water Hyacinth Water Weeds From Pallikkal River Ch 500 M To Ch 800 M Up Stream Side Of Karoorkadavu Bridge
Description
General Pre Monsoon Flood Mitigation Work 2024 Desiltation Removal Of Water Hyacinth Water Weeds From Pallikkal River Ch 500 M To Ch 800 M Up Stream Side Of Karoorkadavu Bridge In Mynagappally Panchayath General Civil Work
Organisation Irrigation Department | State Govt. and UT
Tender Id 2024_Irrig_687914_1
Reference
Number
IRR/IA/TR/5781/2024_5_1_1/1
Tender Fee 555
EMD 4460
Tender Value
Place Karoorkadavu
Link https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1070486
Start Date August 27, 2024 21:30
End Date

02/09/2024 ( Expired 276 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.

W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.

Read more
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

Read more
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m

Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m

Read more
Rfp for appointment of consultant for preparation of dpr to connect the krishna river right bank bund road (from the existing flood pumping station near undavalli) to the downstream of the right bank bund road (up to varadhi) in andhra pradesh

Request for proposal for appointment of consultant for preparation of detailed project report to connect the krishna river right bank bund road (from the existing flood pumping station near undavalli) to the downstream of the right bank bund road (up to varadhi) in andhra pradesh.

Read more
Face-lifting work of eastern side wall from ground to top floor of prayukti bhavan, jadavpur university main campus, for protect water seepage.

Face-lifting work of eastern side wall from ground to top floor of prayukti bhavan, jadavpur university main campus, for protect water seepage.

Read more
Under the state disaster reduction ,the necessary temporary protective work is being carried out to pr additional damage in future to the damaged road due to excessive water flow of gola river from vanbhulpura railway crossing to gola bridge in

Under the state disaster reduction ,the necessary temporary protective work is being carried out to pr additional damage in future to the damaged road due to excessive water flow of gola river from vanbhulpura railway crossing to gola bridge in

Read more
Permanent rectification of black spot (id no. cg-(03)-07) at pairi river approach-loharapta bridge gariyaband side from km.59.400 to km.60.100 of nh-130c on sbd mode in the state of chhattisgarh.

Permanent rectification of black spot (id no. cg-(03)-07) at pairi river approach-loharapta bridge gariyaband side from km.59.400 to km.60.100 of nh-130c on sbd mode in the state of chhattisgarh.

Read more
Dg deglur(g.c.) i.a. m and r to wss annual maintenance for pumps, motors, raw water rising main, operation and maintenance of distribution system.

Midc has established 1 mld temporary wss for catering the water demand of plot holders in degloor i.a. the raw water is lifted from jack well constructed at bank of manyad river at vazarga village through 100 mm dia. d.i. rising main up to sump in de

Read more
General emergency monsoon preparedness 2025 26 desiltation and removal of water hyacinth from chanjoottil naduthodu in ward no 08 of sasthamcotta grama panchayath general civil work

General emergency monsoon preparedness&amp#x0d 2025 26 desiltation and removal of water&amp#x0d hyacinth from chanjoottil naduthodu in&amp#x0d ward no 08 of sasthamcotta grama&amp#x0d panchayath general civil work

Read more
General emergency monsoon preparedness 2025 26 desiltation and removal of water hyacinth from chanjoottil kara thodu in ward no 08 of sasthamcotta grama panchayath general civil work

General emergency monsoon preparedness 2025 26 desiltation and removal of water hyacinth from chanjoottil kara thodu in ward no 08 of sasthamcotta grama panchayath general civil work

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise