Tender Details

Particulars Details
Title
Pbmc Estimate Of Morshi Chandurbazar Achalpur Section Km0.00 To 53.719 Of Nh353 J Length 42.594 Having Two Lane With Paved Shoulders 4 Lane In The State Of Maharashtra
Description
Pbmc Estimate Of Morshi Chandurbazar Achalpur Section Km0.00 To 53.719 Of Nh353 J Length 42.594 Having Two Lane With Paved Shoulders 4 Lane In The State Of Maharashtra
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2024_MoRTH_829922_1
Reference
Number
14/EENH/AMT/2024-25, Dt.09/10/2024
Tender Fee 11800
EMD 36.86 Lakh
Tender Value
Place Morshi
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=872103

Start Date October 09, 2024 14:30
End Date
Expired 06/12/2024

Expired 569 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Read more
Engagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp

Engagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor

Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor

Read more
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Read more
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam

Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam

Read more
Pbmc estimate of nandgaonpeth morshi warud mh mp border section form km0.00 to95.390 of nh353k length 88.291 km having two lane with paved shoulders 4 lane in the state of maharashtra for 5 year maintenance period

Pbmc estimate of nandgaonpeth morshi warud mh mp border section form km0.00 to95.390 of nh353k length 88.291 km having two lane with paved shoulders 4 lane in the state of maharashtra for 5 year maintenance period

Read more
Blance work of nh353j morshi chandurbazar achalpur nh353j to 2lps configuration in the state of maharashtra

Blance work of nh353j morshi chandurbazar achalpur nh353j to 2lps configuration in the state of maharashtra

Read more
Construction of balance work nh morshi chandurbazar achalpur nh 353j in the state of maharashtra

Construction of balance work nh morshi chandurbazar achalpur nh 353j in the state of maharashtra

Read more
Pbmc of r u kalamb ralegaon wadki nh361b km0.00 to 50.275 km 50.275 to two lane with paved shoulders configuration for 5 year aintenance period in the state of mahsrashtra

Pbmc of r u kalamb ralegaon wadki nh361b km0.00 to 50.275 km 50.275 to two lane with paved shoulders configuration for 5 year aintenance period in the state of mahsrashtra

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise