Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Pbmc Estimate Of Morshi Chandurbazar Achalpur Section Km0.00 To 53.719 Of Nh353 J Length 42.594 Having Two Lane With Paved Shoulders 4 Lane In The State Of Maharashtra
|
| Description |
Pbmc Estimate Of Morshi Chandurbazar Achalpur Section Km0.00 To 53.719 Of Nh353 J Length 42.594 Having Two Lane With Paved Shoulders 4 Lane In The State Of Maharashtra
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2024_MoRTH_829922_1 |
|
Reference Number |
14/EENH/AMT/2024-25, Dt.09/10/2024 |
| Tender Fee | 11800 |
| EMD | 36.86 Lakh |
| Tender Value | |
| Place | Morshi |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=872103 |
| Start Date | October 09, 2024 14:30 |
| End Date |
Expired
06/12/2024
Expired 569 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreEngagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp
Engagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read morePbmc estimate of nandgaonpeth morshi warud mh mp border section form km0.00 to95.390 of nh353k length 88.291 km having two lane with paved shoulders 4 lane in the state of maharashtra for 5 year maintenance period
Pbmc estimate of nandgaonpeth morshi warud mh mp border section form km0.00 to95.390 of nh353k length 88.291 km having two lane with paved shoulders 4 lane in the state of maharashtra for 5 year maintenance period
Read moreBlance work of nh353j morshi chandurbazar achalpur nh353j to 2lps configuration in the state of maharashtra
Blance work of nh353j morshi chandurbazar achalpur nh353j to 2lps configuration in the state of maharashtra
Read moreConstruction of balance work nh morshi chandurbazar achalpur nh 353j in the state of maharashtra
Construction of balance work nh morshi chandurbazar achalpur nh 353j in the state of maharashtra
Read morePbmc of r u kalamb ralegaon wadki nh361b km0.00 to 50.275 km 50.275 to two lane with paved shoulders configuration for 5 year aintenance period in the state of mahsrashtra
Pbmc of r u kalamb ralegaon wadki nh361b km0.00 to 50.275 km 50.275 to two lane with paved shoulders configuration for 5 year aintenance period in the state of mahsrashtra
Read moreof your Industry type