Tender Details
Particulars | Details |
---|---|
Title |
Maintenance Development Of Road From Khayerpur Tri Junction To Old Motorstand Ch 1.125 Km To 2.250 Km Sh Widening By Gsb,Wmm,Bm, Bc And Road Marking
|
Description |
Maintenance Development Of Road From Khayerpur Tri Junction To Old Motorstand Ch 1.125 Km To 2.250 Km Sh Widening By Gsb,Wmm,Bm, Bc And Road Marking
|
Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
Tender Id | 2025_CEPWD_59400_1 |
Reference Number |
176/SE-II/PWD(RandB)/2024-25 |
Tender Fee | 4000 |
EMD | 2.85 Lakh |
Tender Value | |
Place | AGARTALA |
Link | https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=60414 |
Start Date | March 11, 2025 00:25 |
End Date |
09/04/2025 ( Expired 35 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening and strengthening of road from lunkaransar to baderan km 0/0 to 15/0
Widening and strengthening of road from lunkaransar to baderan km 0/0 to 15/0
Read moreP and l of dbm 7.50 cm, bc 4.00 cm with hmp mix, laying by p/finisher and including cleaning of rd surface, applying p/coat and t/coat, road marking 2.5 mm thick for surf wks bet km 98.5 and km 107.2 on rd birdhwal-pugal-bajju under 101 rcc/49 brtf
P and l of dbm 7.50 cm, bc 4.00 cm with hmp mix, laying by p/finisher and including cleaning of rd surface, applying p/coat and t/coat, road marking 2.5 mm thick for surf wks bet km 98.5 and km 107.2 on rd birdhwal-pugal-bajju under 101 rcc/49 brtf
Read moreMahisadal-nandigram road (mdr), from 5.650 km. to 10.650 km. - widening and strengthening works in the district of purba medinipur under tamluk division, pwd
Mahisadal-nandigram road (mdr), from 5.650 km. to 10.650 km. - widening and strengthening works in the district of purba medinipur under tamluk division, pwd, project id-pd252632621s000
Read moreSurfacing works of gsb 15 cm thick wbm 75 mm thick dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification between km 0.000 to km 14.350 on puwarti gomaguda road
Surfacing works of gsb 15 cm thick wbm 75 mm thick dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification between km 0.000 to km 14.350 on puwarti gomaguda road
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreConstruction of infrastructure and development work at new itbp camp situated in lapthal valley approx. height 14694 ft and approx 126 km from joshimath, distt chamoli (ukd) connected by metalled road 98 km and 28 km kuchha road.
Construction of infrastructure and development work at new itbp camp situated in lapthal valley approx. height 14694 ft and approx 126 km from joshimath, distt chamoli (ukd) connected by metalled road 98 km and 28 km kuchha road.
Read moreC/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd
C/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd
Read moreConstruction of retaining wall work in design ch. 0.700, 2.800, 16.200, 14.200 and 18.400, on risk and cost basis of contractor under rehabilitation and upgradation of nh-66 (old nh 17) from km 161.600 to km 205.400 (kashedi to parshuram ghat sec
Construction of retaining wall work in design ch. 0.700, 2.800, 16.200, 14.200 and 18.400, on risk and cost basis of contractor under rehabilitation and upgradation of nh-66 (old nh 17) from km 161.600 to km 205.400 (kashedi to parshuram ghat sec
Read moreRehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Read moreMaintenance of road from tula bagan office tilla (house of gopal banik) to bb tilla loknath mandir during the year 2025-26 / sh wbm-iii, carpeting ,seal coat etc.(l-0.60 km)
Maintenance of road from tula bagan office tilla (house of gopal banik) to bb tilla loknath mandir during the year 2025-26 / sh wbm-iii, carpeting ,seal coat etc.(l-0.60 km)
Read moreof your Industry type