Tender Details
Particulars | Details |
---|---|
Title |
Mallikarjuna Temple South East Road Balance Portion Drain With Cover Slab In Ward 14 Of Elankunnapuzha Gp Under Annual Plan 2023 24 Epz 284 /24
|
Description |
Refer Tender Document
|
Organisation | Government of Kerala |
Tender Id | 2023_LSGD_595645_1 |
Reference Number |
T/AE/LSGD/EGP/E-TENDER63/23-24 |
Tender Fee | 555 |
EMD | 1439 |
Tender Value | |
Place | LID and EW Section Elamkunnapuzha |
Link | https://etenders.kerala.gov.in |
Start Date | August 14, 2023 21:30 |
End Date |
23/08/2023 ( Expired 640 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Widening re construction to four lane from km 0.000 to km 15.870 near miriyan telangana karnataka border chincholi section of nh 167n in kalaburagi district in the state of karnataka on ham under annual plan 2023 24
Read moreWidening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Widening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreImprovement of road portion from post office chowmuhani to netaji chowmuhani under central iii sub division pwd(randb) sh construction of rcc cover drain along with shoulder and footpath on lhs of the road from post office chowmuhani to netaji chowmu
Improvement of road portion from post office chowmuhani to netaji chowmuhani under central iii sub division pwd(randb) sh construction of rcc cover drain along with shoulder and footpath on lhs of the road from post office chowmuhani to netaji chowmu
Read moreImprovement of road portion from post office chowmuhani to netaji chowmuhani under central iii sub division pwd(randb) sh construction of rcc cover drain along with shoulder and footpath on rhs of the road from post office chowmuhani to netaji chowmu
Improvement of road portion from post office chowmuhani to netaji chowmuhani under central iii sub division pwd(randb) sh construction of rcc cover drain along with shoulder and footpath on rhs of the road from post office chowmuhani to netaji chowmu
Read moreConstruction of pcc approch road with earthfilling and drum sheet- sal ballah pilling connecting 9 mtr box culvert cover arpara canal from kubernagar bazar to satyapur villege in bikrampur gp under nakashipara development block at jl no. 20, mouza a
Construction of pcc approch road with earthfilling and drum sheet- sal ballah pilling connecting 9 mtr box culvert cover arpara canal from kubernagar bazar to satyapur villege in bikrampur gp under nakashipara development block at jl no. 20, mouza a
Read moreReplacement of concrete slab, drain cover slab, sign board, fod trap, repair to joints with grade b and polyurethane and connected items in tech area at af stn ambala under ge (af) amabla
Replacement of concrete slab, drain cover slab, sign board, fod trap, repair to joints with grade b and polyurethane and connected items in tech area at af stn ambala under ge (af) amabla
Read moreConstruction of drain with cover slab from the h.o biswajit chowdhury to h.o balai debnath near ag quarter, under ward no.05, amc
Construction of drain with cover slab from the h.o biswajit chowdhury to h.o balai debnath near ag quarter, under ward no.05, amc
Read moreConstruction of r.c.c drain at beside rupkatha cinema hall to tikia tuli masque more with r.c.c cover slab in ward no 11 under englishbazar municipality, malda
Construction of r.c.c drain at beside &#x0d rupkatha cinema hall to tikia tuli &#x0d masque more with r.c.c cover slab &#x0d in ward no 11 under englishbazar &#x0d municipality, malda
Read moreConstruction of pcc road and rcc cover slab beside house of tapan ghosh at dwarika prasad lane and p.c.c platform at backside of sisti jaladhar at baluchar (n) in ward no 09, plumbing work and painting with supply of water tank with iron gate
Construction of pcc road and rcc cover slab beside house of tapan ghosh at dwarika prasad lane and p.c.c platform at backside of sisti jaladhar at baluchar (n) in ward no 09, plumbing work and painting with supply of water tank with iron gate
Read moreof your Industry type