Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Shifting Of Lt Line From Jambubania Village To Danra Village Due To Widening And Strengthening Of Talcher Gopalprasad Kaniha Road (16.194 To 17.5 Hm)
|
| Description |
Shifting Of Lt Line From Jambubania Village To Danra Village Due To Widening And Strengthening Of Talcher Gopalprasad Kaniha Road (16.194 To 17.5 Hm)
|
| Organisation | EIC-CIVIL | State Govt. and UT |
| Tender Id | 2025_EICCL_116354_1 |
|
Reference Number |
Bid Identification No.S.E.E.C (RandB) 08/2025-26 |
| Tender Fee | 10000 |
| EMD | 64849 |
| Tender Value | - |
| Place | Angul |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=548996 |
| Start Date | August 12, 2025 22:30 |
| End Date |
Expired
25/08/2025
Expired 417 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
For the shifting work of existing 11 kv lt line and transformer due to widening of road from dangipar to bhagalpur via jungle ayodya prasad distt gorakhpur
For the shifting work of existing 11 kv lt line and transformer due to widening of road from dangipar to bhagalpur via jungle ayodya prasad distt gorakhpur
Read moreWidening and strengthening work including pole and utility shifting on the atrauli palimukimpur road (other district road) in aligarh district, covering chainage 0.000 to 9.700.
Pole shifting work
Read moreFor the shifting work of existing 33 kv 11 kv lt line and transformer due to widening of shivpur to belwar via dari jungle and kewatliya tola distt gorakhpur
For the shifting work of existing 33 kv 11 kv lt line and transformer due to widening of shivpur to belwar via dari jungle and kewatliya tola distt gorakhpur
Read moreShifting of raw water rising mains from badi talab to pichhola due to widening of road between rampura circle and ubeshvar ji tiraha under uwss udaipur including twelve months defect liability period on single point responsibility basis.
Shifting of raw water rising mains from badi talab to pichhola due to widening of road between rampura circle and ubeshvar ji tiraha under uwss udaipur including twelve months defect liability period on single point responsibility basis.
Read moreWork of utility shifting removing of electricity poles wire etc on the widening and strengthening work of bahraich-banda city road four laning from kalu kuan chauraha to mahokhar bypass length 4.00 km
Work of utility shifting removing of electricity poles wire etc on the widening and strengthening work of bahraich-banda city road four laning from kalu kuan chauraha to mahokhar bypass length 4.00 km
Read moreShifting of water supply pipelines to the edge of the road boundary in connection with the widening and strengthening of mahabubnagar nalgonda road from existing double lane to four lane from km 156/2 to km 163/2 in nalgonda district
Shifting of water supply pipelines to the edge of the road boundary in connection with the widening and strengthening of mahabubnagar nalgonda road from existing double lane to four lane from km 156/2 to km 163/2 in nalgonda district
Read moreShifting of 33kv/11kv/lt lines and 5x100kva distribution transformers due to obstructing the construction of road widening towards airport from collector camp office to aerodrome ground area in operation section adilabad town-3 of adilabad town sub-division in adilabad division of adilabad circle on partial turnkey basis
Shifting of 33kv/11kv/lt lines and 5x100kva distribution transformers due to obstructing the construction of road widening towards airport from collector camp office to aerodrome ground area in operation section adilabad town-3 of adilabad town sub-division in adilabad division of adilabad circle on partial turnkey basis
Read moreProposal for shifting of 11kv lt lines along with dtrs due to road widening work from the existing 4lane road to 6 lane road boundaries 66 feet from the centre line on either side of the road from bellampally chowrasta to srinivasa garden in mancherial town 2 section of mancherial sub division, mancherial division, mancherial circle, on partial turnkey basis
Proposal for shifting of 11kv lt lines along with dtrs due to road widening work from the existing 4lane road to 6 lane road boundaries 66 feet from the centre line on either side of the road from bellampally chowrasta to srinivasa garden in mancherial town 2 section of mancherial sub division, mancherial division, mancherial circle, on partial turnkey basis
Read moreShifting of electrical utilities due to road widening and strengthening work of chalpatty road under bidhannagar-ii division, wbsedcl
Shifting of electrical utilities due to road widening and strengthening work of chalpatty road under bidhannagar-ii division, wbsedcl
Read moreShifting of ht/lt line due to widening and strengthening of road village babail to mohali at district panipat.
Shifting of ht/lt line due to widening and strengthening of road village babail to mohali at district panipat.
Read moreof your Industry type